HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to remove the hook from the lifting lugs after the tower equipment has been lifted?

2017-12-27View Original

Thread Content

After the large-scale equipment has been lifted into place and aligned during petrochemical construction, how does one release the hook? I need expert advice. . .
Reply #22017-12-29
It has shaft-type lugs, with a pull rope attached to the hook, making it easy to lower the hook once in place. Sidewall lugs are troublesome as they require someone to climb up to retrieve them.
Reply #32017-12-30
A small rope is tied to the auxiliary hook of the crane and connected to the main rope~~~ The side lifting eye (connected using a sling from the main rope) allows the auxiliary hook to be used in order to release the main rope~~~ If the load is supported directly by the hook, then it’s necessary to use the auxiliary hook to send someone up to release it~~~~~~~~~~~~~~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.