What is the nitrogen pressure at the end of the operation for the PLAN72+75 dry gas seal?

2018-03-08View Original

Thread Content

What exactly is the alarm pressure for 75? All this information seems unreliable
Reply #22018-03-08
0.015-0.12MPa
Reply #32018-03-08
The pressure of the 72+75 secondary nitrogen seal is controlled by 2 orifice plates. If a leak from the first stage enters the second stage, it’s equivalent to a stream of leaked fluid directly entering the second stage. This causes the pressure between the orifice plates to rise. When it reaches 0.12 MPa (which is our case), it indicates that there has been a certain degree of leakage at the first stage, and disassembly for repair is required.
Reply #42018-03-11
Floor 4 is the correct answer; let’s give it support~~
Reply #52018-03-12
After some discussion, it was decided to set the value at the N2 inlet to 0.2, while the values at the outlet should be set to 0.07 and 0.12; alarms will be triggered in case of leaks

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.