HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation method for BB5 double-casing multi-stage pump

2019-01-24View Original

Thread Content

Are BB5 radially split double-shell horizontal multi-stage pumps all installed with the rotor lifted and placed vertically inside the outer shell? Please reply if you have experience with their assembly
Reply #22019-01-24
It can be installed vertically in factories and repair shops; without removing the cylinder on site, assembly and disassembly tools, rollers, and brackets are required.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.