HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Mechanical seal flushing plan

2020-06-18View Original

Thread Content

As shown in the figure, what is the flushing scheme?
Reply #22020-06-18
Is there a nitrogen source on site? If so, it is PLAN11+53A; otherwise, it is PLAN11+52
Reply #32020-06-18
It’s not completely captured; it seems to be PLAN13+52 or 53A
Reply #42020-06-18
I took another look at the pictures; the flushing for internal sealing seems to not be Plan11
Reply #52020-06-18
It is PLAN11+52. You are correct
Reply #62020-06-18
Doesn’t Plan11 go from the pump’s outlet, through the flow control orifice plate, to the sealing chamber? Is the inlet on top of this pump and the outlet at the bottom?
Reply #72020-06-19
Yes, but the device specifications show PLAN11+52. There is indeed an anomaly
Reply #82020-06-19
Based on the pipeline diameter, it can be determined whether the inlet and outlet are from the sealing chamber to inlet PLAN13+52 or 53A
Reply #92020-06-19
I just searched on Baidu – isn’t 13 used for vertical pumps?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.