Construction officially commenced on Bid 4 of the EPC project for Guangdong Petrochemical’s 20 million tons per year production facility. On March 27, 2020, Zhenhai Co., Ltd. issued a announcement regarding the progress of Bid 4 of the EPC project for the main processing units of this 20 million tons per year heavy oil processing facility, which is a joint venture between Chinese and Venezuelan parties. The announcement states that on March 25, 2020, Zhenhai Petrochemical Engineering Co., Ltd. held a ceremony at the project site to mark the start of the civil engineering and installation work for Unit 7 of the sulfur recovery facility in the Guangdong Petrochemical Integration Project (EPC), based on the \"Project Start-up Report\" and \"Project Start-up Application Form\" approved by the project owner. This marks the official commencement of Phase 4 of the EPC project for the main plant of the 20 million tons per year heavy oil processing facility at Guangdong Petrochemical, a Sino-Venezuelan joint venture under the general contracting of Zhenhai Co., Ltd. It is reported that on September 17, 2019, at the fifth meeting of its fourth board of directors, Zhenhai Co., Ltd. approved the signing of a general contract for Section 4 of the EPC project related to the main processing facilities for the 20 million tons per year heavy oil processing plant in Guangdong Petrochemical, a joint venture between CNPC and Sinopec, with Guangdong Petrochemical Branch of China National Petroleum Corporation. The contract price is 1,547,465,623.73 RMB (excluding tax)
Scope of this bid section: 2700) Comprehensive part of the seven-unit plant; 2701) 180,000 tons/year sulfur recovery unit I; 2702) 180,000 tons/year sulfur recovery unit II; 2703) 180,000 tons/year sulfur recovery unit III; 2704) 180,000 tons/year sulfur recovery unit IV; 2705) 60,000 tons/year sulfur recovery unit; 2706) 350 tons/hour acidic water stripping unit (non-hydrogenation type); 2707) 350 tons/hour acidic water stripping unit (hydrogenation type); 2708) 1,000 tons/hour solvent regeneration unit (hydrogenation type); 2709) 1,500 tons/hour solvent regeneration unit (non-hydrogenation type); 2710) Acidic water tank area and liquid sulfur tank area; b)?7# Oil-containing wastewater pretreatment station (2791) ; Qili United Substation (2786) ; Seven Combined Cabinet Room (2781)
The scope of work under the contract is based on the approved basic design documents for each individual item, and includes the detailed design, procurement, and construction of each project, as well as supporting the owner in tasks such as joint commissioning, trial operation with feed, startup, and performance testing; Complete the preparation of completion documents ; Assume the quality warranty responsibilities during the warranty period. The contract duration for Section 4 of the EPC project for the main processing units of the Sino-Venezuelan joint venture Guangdong Petrochemical’s 20 million tons per year heavy oil processing facility is determined based on the scheduled completion dates for each individual task. Each sub-project of the engineering work will be handed over in phases, from June 30, 2021, to November 30, 2021.
You can get in touch to gather some information; Guan Guan might have relevant details. @ZhiZheMing @GuanGongYu -------------------------------------- Everyone is welcome to participate in the following series of sharing discussions; clicking on the link will take you there. -------------------------------------------------------------------------- This is a compilation post for the 【Haichuan Equipment Guessing Game】 series – all equipment enthusiasts are encouraged to join! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum) Summary post for the 【Haichuan. Pioneers in the Chemical Industry】 series. https://bbs.hcbbs.com/thread-1842627-1-1.html (Source: Haichuan Chemical Industry Forum) Summary post for the 【In-depth Discussion on Modular Installation in Haichuan】; everyone is welcome to participate in the discussion! https://bbs.hcbbs.com/thread-1773168-1-1.html (Source: Haichuan Chemical Industry Forum) [Haichuan – Season 4 of ‘Strange Safety Hazards in Haichuan’: a compilation post that is being updated continuously; everyone is welcome to join the discussions.] https://bbs.hcbbs.com/thread-2748458-1-1.html (Source: Haichuan Chemical Industry Forum) The series of posts on ‘Guess the Food Items’ is also being updated continuously – with thousands of different foods, can you recognize them all? https://bbs.hcbbs.com/thread-2142205-1-1.html (Source: Haichuan Chemical Industry Forum) [Haichuan Chemical Industry Site] Summary post on nitrate caves – why did ancient people produce nitrate in caves? ? https://bbs.hcbbs.com/thread-2145992-1-1.html (Source: Haichuan Chemical Industry Forum)
Following CNPC’s practice, recruitment is primarily carried out through internal system applications, supplemented by campus recruitment, with very little external recruitment.
This year, Sinopec, CNPC, and CNOOC have all expanded their recruitment
Internal transfer within CNPC. Then there’s campus recruitment. They basically don’t conduct social recruitment.
The three major oil companies don’t recruit from the job market – it’s their usual approach; they want to deal with the issue of graduates