The bidding process for the preparation of the preliminary feasibility study for Phase 1 of the \"Hydrogen Sichuan Liangshan\" green hydrogen-based products demonstration base project in Liangshan, Sichuan, has been completed

2026-04-08View Original

Thread Content

Monthly update: Significant progress has been made in the “Hydrogen Sichuan Liangshan” green hydrogen-based products demonstration project in Liangshan, Sichuan. **Guohua Investment, under the Energy Group, has completed the bidding process for the preparation of the pre-feasibility study for Phase 1 of the project, and the results of the bidding have been officially announced. Meanwhile, China Power Construction Chengdu Survey and Design Institute initiated the procurement of technical services for the chemical processing aspect, committing to completing the pre-feasibility study for the green hydrogen–green ammonia integrated system within 60 days, marking a shift from the initial planning stage to the actual implementation phase of this project. As the first large-scale green hydrogen demonstration project established by the **energy group in the southwest region, this project is planned to have a total installed capacity of 1,800 MW, along with the construction of a green ammonia production facility capable of producing 100,000 tons per year, as well as a complete industrial chain for hydrogen energy. With the commencement of the design work, a mega-project covering hydrogen production, storage and transportation, ammonia synthesis, and end-use applications is being accelerated in implementation, and the demand for valves as well as the industrial opportunities arising from it are already becoming apparent. Driven by the \"dual carbon\" goals, the hydrogen energy industry is moving from demonstration to large-scale development. The “Hydro-Sichuan Liangshan” green hydrogen-based products demonstration base in Liangshan, Sichuan, is becoming one of the most iconic model projects in the southwest region.
Reply #22026-04-08
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-08
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Using the Chains of a Manual Winch to Directly Tie Up Loads https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717305 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-08
【Haichuan Equipment Guessing Game】What equipment is this being cleaned? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717350 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-04-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】3069–2026: The Aerospace Long March and Inner Mongolia Baofeng’s establishment of China’s first cluster of electrolytic hydrogen production facilities installed outdoors https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717373 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-09
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Failure to Use Appropriate Insulating Pads When Carbon Steel Supports and Brackets Come into Direct Contact with Stainless Steel Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717387 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-09
【Haichuan Equipment Guessing Game】What kind of equipment is this, and what task does it perform? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717374 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-04-09
【HaiChuan Safety Discussion】Hidden Dangers Around Us -- Failure of Sealing in Casing for Pipeline Penetration Through Fire Dams https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717423 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #92026-04-10
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, SHENGU Group successfully developed the world’s first reciprocating compressor with an ultra-high thrust of 2000 kN! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717432 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-04-10
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112026-04-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen-blended combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen blended combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haichuan Chemical Engineering Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.