Thread Content
On May 2, the large-scale dealcoholization tower for Hubei Sanning ethylene glycol project, constructed by 16th Chemical Construction Company, was hoisted into place. This project is a key construction project in Hubei Province; it is a relocation and transformation initiative aimed at actively implementing the strategy for the comprehensive protection of the Yangtze River and promoting green development. The project is located in the Yaojiagang Chemical Industry Park in Zhijiang City, Hubei Province. With a total investment of 8.5 billion yuan, 1.2 billion yuan of that is allocated to the installation of the facilities. Shiliu Huajian has been entrusted with the general contracting work for the installation phase of Package 4 in the ethylene glycol processing area. The dealcoholization tower lifted this time is the largest equipment in the Hubei Sanning project. The equipment dimensions are 6000mm*79400mm, with a weight of 288.87 tons. The project team used a 1250-ton crawler crane for the main lifting operation, a 450-ton crawler crane for assisting with the lifting process, and a 150-ton crawler crane to serve as a counterweight. Through tasks such as lifting, steering, and raising, the lifting was completed in 4 hours. During the resumption of work, the project team strictly followed the requirements related to epidemic prevention and control as well as the resumption of operations, carrying out health checks for all employees and routine disinfection tasks. They completed the scheduled tasks to a high standard, thus laying a solid foundation for future work. (Source: China National Chemical Engineering Group Corporation)
On April 6, the command center for Sanning Chemical’s ethylene glycol project launched the “100-Day Campaign to Ensure Full Completion and Trial Production of the Ethylene Glycol Project by July” initiative. Mobilize all project construction personnel to strengthen their confidence, overcome difficulties, and advance the project construction comprehensively with higher standards, best quality, a tidy construction site, and the fastest pace. The campaign calls on all construction workers to understand the situation, raise their awareness, and swiftly launch a surge in construction efforts over the 100-day period. All departments and regions should intensify publicity and mobilization efforts, guiding all those involved in the project construction to develop a sense of urgency and responsibility at this critical stage of the project. They must take on the mission of \"building a world-class ethylene glycol production facility to help Sanning Company achieve a historic transformation,\" ensuring that \"there is proper awareness, leadership responsibility, effective mobilization, adequate resource allocation, proper process control, and suitable incentive measures.\" Every possible and effective measure should be taken to fully accomplish the goals and tasks of the project construction.
It’s that slogan again: “100-day battle” – definitely don’t end up like Jiangxi.
Jingzhou has been left behind again, sigh~~
Where do the raw materials come from? I guess it has something to do with the Menghua Railway; some of the coal coming from the northwest is processed here
This reminder is right; remembering the past can serve as a guide for the future. Hubei projects built by people from Hubei.
The loss of Jingzhou was a major setback; over those 20 years in Jingzhou, most of the efforts were focused on changing its name. Was all that energy spent on that? Is this project far from Jingzhou? ?
The installation quality of chemical construction companies is still somewhat inferior to that of oil and petrochemical installation firms; in most cases, the towers are lifted into place in their bare state.