Thread Content
Recently, the modification to the 300,000 tons per year coal tar hydrogenation project at Ulan Xinrui Coal Chemical Co., Ltd. in Ordos City was approved for record-keeping. After the change, the construction site for this project is located in the Shengyuan Industrial Park of Mengsu Economic Development Zone, bordered to the north by the parking lot in the factory area, to the south by the Xiaohu Line, to the west by the maintenance and repair buildings, and to the east by the main road within the factory area. The project owner is Ordos Wulan Xinxui Coal Chemical Co., Ltd., and the total investment amount has been changed from 1.2 billion yuan to 2 billion yuan. Construction scale and scope: It is capable of processing 300,000 tons of coal tar per year; through fluidized bed and fixed-bed hydrogenation units, it produces approximately 280,000 tons of products such as 1# coal-based hydrogenated oil, 2# coal-based hydrogenated oil, 3# coal-based hydrogenated oil, and liquefied gas. Changed to: 300,000 tons of coal tar processed per year. This includes the capacity to process 270,000 tons of coal tar per year, as well as 30,000 tons of waste mineral oil, waste hydraulic oil, and waste lubricant materials. It is equipped with a bubbling-bed and fixed-bed hydrogenation unit, a coal-water slurry gasification combined hydrogen production plant with a capacity of 25,000 standard cubic meters per hour, power boilers, sewage treatment facilities, oil storage and transportation systems, and loading/unloading platforms. The facility is capable of producing 280,000 tons of Type 1 coal-based hydrogenated oil, Type 2 coal-based hydrogenated oil, and Type 3 coal-based hydrogenated oil; it also produces some liquefied gas and sulfur products. Its total area is 18.183 hectares.
Before the change, the 300,000 tons per year coal tar hydrogenation project of Ordos Wulan Xinrui Coal Chemical Co., Ltd. was located within the premises of this company in Zhejialiang Village, Wulamulun Town, Yijinholo Banner, Ordos City. The site bordered the road leading to the closed coal storage shed of the coking plant to the north, the gate of the coke storage area to the south, the maintenance and repair building to the west, and the main road within the factory complex to the east. It covers an area of about 120 mu. The project owner is Ordos Wulan Xinrui Coal Chemical Co., Ltd., with a total investment of 1.2 billion yuan. Construction scale and scope: It is capable of processing 300,000 tons of coal tar per year; through fluidized bed and fixed-bed hydrogenation units, it produces approximately 280,000 tons of products such as 1# coal-based hydrogenated oil, 2# coal-based hydrogenated oil, 3# coal-based hydrogenated oil, and liquefied gas. Planned construction period: December 2020 to December 2022
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Station Water Outlet Height Less Than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested at the Tarim Phase II ethylene project of Dushanzi Petrochemical Company. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3033-2026: China’s first 10,000-ton-scale demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 3039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))