【HaiChuan Chemical Project Updates】Sany Heavy Industry delivers 4,000-ton crane – which project in Shandong will use it for the first lift?

2020-05-22View Original

Thread Content

It is understood that on May 21, the 4,000-ton crawler crane independently developed and produced by Zhejiang Sany Equipment Co., Ltd. completed its final 120-meter test of the main boom at the test site, after which it was delivered and sent to Shandong. It is reported that this \"giant\" crane has a maximum lifting capacity of 4,000 tons; it can lift objects weighing 2,000 tons to a height of 100 meters. Its maximum lifting torque is 90,000 ton-meters (that is, it can lift 4,000 tons at a radius of 22.5 meters)
Reply #22020-05-22
This device features a unique dual-crawler jacking counterweight trolley, along with a reliable slewing drive system, **which enhances its driving force. At the same time, taking into account the characteristics of nuclear power hoisting, a jib system with a V-shaped double-jib design was invented to enhance the lateral load-bearing stability of the jib system and to reduce the negative impact of the jib’s weight within the working area on the lifting capacity. More importantly, this product holds over 20 invention patents, two of which are international invention patents.
Reply #32020-05-22
Zhejiang Sany Equipment Co., Ltd., located in the High-Tech Zone of Wuxing District, Huzhou City, is the global production base for Sany Heavy Industry’s crawler cranes. It is equipped with a new product testing facility, intelligent production lines, as well as a complete set of debugging and testing equipment. Last August, Shandong Gulf Lifting Engineering Co., Ltd. ordered this 4,000-ton crawler crane.
Reply #42020-05-22
Sany also produces a “4,000-ton crawler crane” – congratulations! The banner in the photo is blowing wildly; it should be three rows per side! XCMG already has 2 4,000-ton crawler cranes.
Reply #52020-05-22
How much does it cost? How many people are needed to operate this device? Installed power?
Reply #62020-05-22
Hehe, that’s the problem – everyone wants to be number one

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.