Thread Content
On the 13th of the month, the concrete pouring for the dome of Tank No. 1 at the Fujian LNG receiving station project, carried out by Global Engineering Company’s Beijing office, was completed successfully. Thus, the domes of all 3 LNG storage tanks for the Fujian LNG project have been completed, marking the full finish of the construction of the main outer tank structures for these LNG storage tanks.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The Haiwang Hydrogen Energy Ningdong Organic Liquid Hydrogen Storage Material Base began trial production in 203088–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718001 (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first process for producing ethylene glycol from light hydrocarbons, 3085–2026, in Lianyungang https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】3088-2026: China’s first pilot project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))
【In-depth Discussion on Modular Installation of Haichuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose stations, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest opening size – 8.6 meters: Technical validation completed for complete sets of molten salt tank-type heat collectors and related processes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718280 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))