Thread Content
This post was last edited by Swimming Fish in the Desert on 2022-4-25 08:27 Qingdao receiving station has received and unloaded a total of 500 LNG ships. Sinopec News Network News On April 21, the "China Energy Wenzhou" ship, fully loaded with 72,000 tons of liquefied natural gas, safely berthed at the Qingdao LNG receiving station terminal of the Natural Gas Branch. This is the 500th LNG carrier that the terminal has received and unloaded since it was put into operation in November 2014. So far, the Qingdao LNG receiving station of the Natural Gas Branch has received and unloaded a total of more than 35 million tons of LNG, and has supplied a total of more than 35 billion cubic meters of pipeline natural gas to the society. The Qingdao LNG receiving station of the Natural Gas Branch is located in Dongjiakou Economic Zone, Qingdao City. It is the first LNG receiving station of Sinopec and the only LNG receiving terminal currently in use in Shandong Province. The gas supply covers Shandong, Jiangsu, Anhui, Hebei, Henan and other regions. It has an annual transfer capacity of 7 million tons, equivalent to 9.8 billion cubic meters of natural gas. It is one of the main gas sources in North my country. Since "Keep in mind your instructions, make new contributions and achieve greater success, I welcome * ”Since the launch of the theme action, Qingdao LNG receiving station has focused on "smart and efficient", accelerated digital transformation and equipment management upgrades, continuously optimized production operations, promoted the reform of the production control system, and ensured the safety and efficiency of ship receiving and unloading. During the COVID-19 prevention and control period, Qingdao LNG receiving station safely and smoothly received and unloaded the world's second largest Q-Flex LNG ship, setting a new record for the station's receiving and unloading of ultra-large LNG ships, and the resource transfer efficiency reached a new high. Currently, the Qingdao LNG receiving station is accelerating the construction of the world's largest and China's first 270,000 cubic meter LNG storage tank and "dual-berth" LNG terminal. It is expected to be completed and put into operation by the end of 2023. The annual transfer capacity will reach 11 million tons and the annual gas supply capacity will reach 15.4 billion cubic meters. It will then become the largest LNG receiving station under construction in the country during the same period.
There is also a large lng in Longkou, Shandong
To be precise, there are two big ones and one small one.
Shandong is a heavy chemical energy base