HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is heat treatment required after surfacing the inner wall of large-scale equipment?

2022-05-15View Original

Thread Content

Is heat treatment required after surfacing the inner wall of large-scale equipment? Related posts: @RedLee_ZZHI @Shutong @Mighty Ultraman. @Wisdom enlightens @StudentInTheSeaOfKnowledge @LogisticsEngineer 【Major Chemical Equipment in a Major Country】2 hydrogenation reactors with full inner wall cladding made of Hastelloy for the 1.85-2×2.5 million tons/year PTA project https://bbs.hcbbs.com/thread-3336709-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Forum Website)
Reply #22022-05-15
It is determined based on production conditions and medium requirements; usually, it is necessary to
Reply #32022-05-15
How to do it with such a large device? ? Do it all together? ? ? ?
Reply #42022-05-15
Participate more in discussions to make the forum even more popular
Reply #52022-05-15
How to do it? Do it in segments or as a whole?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.