This post was last edited by Desert Fish on 2022-5-18 at 18:34. China’s first LNG (liquefied natural gas) storage tank with a capacity of 270,000 cubic meters was successfully completed in the Dongjiakou Port Area of Qingdao, Shandong
【Major Industrial Equipment in the Chemical Industry】242 – CCTV News reports on the modular construction of Yancheng’s largest storage tank with a capacity of 270,000 cubic meters: https://bbs.hcbbs.com/thread-3344238-1-1.html (Source: Hua Hai Chuan Liu – Haichuan Chemical Forum). Come and take a look! Sinopec and CNOOC are competing in the construction of LNG storage tanks. @RedLee_ZZHI @Nut @Shutong @Mighty Ultraman. @The wise are enlightened @654262293
SE I and Global are both constructing 270,000 cubic meter LNG storage tanks.
If the EU wants to move away from Russia’s LNG, it will likely take 3 to 5 years to build the necessary receiving stations, which means inflicting damage on itself while trying to harm its opponent.
If you say that, it means everyone is doing it everywhere; then China Chemical can’t compete
Each has its strengths. The LNG market is large and comes in many categories.
China National Chemical Corporation lacks the resources and can only engage in design work; the design institutes of the three major oil companies have projects available and better conditions. To grow and become stronger, it’s simple:
The tank has a diameter of 100.6 meters and a height of 55 meters, covering an area equivalent to that of a football field. The total weight of the dome’s lifting structure is approximately 1,500 tons; compared to China’s largest LNG storage tank with a volume of 220,000 cubic meters, this represents a 25% increase in the dome’s weight and a 6-meter increase in its span. During the lifting process, an infrared self-monitoring device was used in combination with manual monitoring to precisely control the even distribution of stress across the 30 steel cables of the dome, ensuring a smooth ascent. The entire process took 107 minutes, and the dome was successfully lifted into place. The dome air jacking is one of the most challenging, complex, and high-risk stages in the installation of large LNG storage tanks. Due to the large size and weight of the dome, the installation process becomes more complex, with higher requirements for assembly precision. Moreover, the flatness of the surface of the concrete outer tank foundation, as well as the control of cracks in mass concrete, become even more stringent. The project team intensified its efforts in technical research and development, designed and manufactured new processing equipment, optimized the prefabrication method for the steel dome segments, innovated construction methods for concrete work on the outer tank walls during winter, and applied a number of patented technologies with independent intellectual property rights. It also successfully utilized the \"270,000 cubic meter prestressed reinforced concrete full-container LNG storage tank technology\" independently developed by Sinopec, thereby advancing the project construction with high quality and efficiency.
The G storage tank is a cryogenic storage tank; lifting a workpiece of such a large diameter is probably only something that China’s infrastructure giants can accomplish