This post was last edited by Desert Fish on 2022-9-2 at 10:46. At 10:17 a.m. on August 28th, colorful flags fluttered and firecrackers were set off at the construction site of Island No. 3 at Yulong Petrochemical. A 1,600-ton ZCC18000-type crawler crane from Sinopec Transportation Company was used as the main lifting device, while a QUY650-type crawler crane served as an auxiliary device; together they managed to lift the R-101 hydrogenation reactor, which weighed 780 tons, into place. This marked the successful completion of the first lifting operation for large-scale equipment in the Yulong refining and petrochemical integration project, and it also officially marked the start of the lifting operations for this project.
On April 4, the diesel hydrogenation project at Shandong Yulong Petrochemical was officially launched. The construction and installation works for a 3.4 million tons/year diesel hydroprocessing unit and a 3.6 million tons/year diesel hydrocracking unit include various tasks such as civil engineering, equipment installation, piping work, steel structure construction, fire protection and water supply/drainage systems, electrical systems, as well as instrumentation and automation control systems.
Thank you for sharing. Over the past few years, refining has been a major project – **continuous efforts have been made, with increasing investment
The equipment we’ve made will take some time to arrive at the site