Thread Content
Praise the prosperity and strength of modern China; witness the significant development in chemical engineering equipment over the past decade. Replies will be rewarded – discussions are welcome. -------------------------------------------On August 2, 2022, at the Qingdao site of Offshore Oil Engineering Co., Ltd., the two modules, A1ED and A1EJ, weighing nearly 14,000 tons, were successfully loaded onto ships. This marks the successful delivery of 12 modules for the Canadian LNG project undertaken by Offshore Oil Engineering. Currently, the overall progress of this project has exceeded 90%, laying a solid foundation for its complete delivery within the year. Canada’s LNG project was built independently by our country, and it is the world’s first modular liquefied natural gas plant constructed in an integrated manner. CNOOC Engineering has been contracted to build 35 modules for Phase 1 of a Canadian LNG project, including all 19 core process modules, with a total weight of approximately 179,000 tons. During the construction of the project, CNOOC Engineering conducted repeated calculations and divided the project into 333 deck sections. It innovatively combined the integrated construction of core modules and process pipe trunks into one process, enabling the joint construction of these two types of components within the project. This approach allowed for maximum utilization of site resources and reduced the construction period.