Jilin Daan’s integrated project for producing green hydrogen and ammonia via wind and solar power, with a total investment of 5.9 billion yuan, is under approval process
Thread Content
The Daan Wind and Solar Power-Based Green Hydrogen for Ammonia Production Integrated Project was submitted for approval. On January 7, 2023, the environmental impact assessment report related to the hydrogen production and ammonia synthesis portion of this demonstration project was made public prior to submission for approval. Daan An Green Hydrogen for Ammonia Production Integrated Demonstration Project (Hydrogen Production and Ammonia Synthesis Section)Project location: The area south of Yi San Road in the Jilin West (Daan An) Clean Energy Chemical Industry Park, Daan An City, Jilin Province.
Project company: Daan An Jidian Green Hydrogen Energy Co., Ltd.
Project overview: This project involves the installation of 50 sets of PEM hydrogen production equipment and 36 sets of alkaline solution-based hydrogen production equipment, resulting in a hydrogen production capacity of 46,000 Nm3/h. There is also a hydrogen storage facility with a capacity of 60,000 Nm3, as well as 1 nitrogen production unit with a capacity of 20,000 Nm3/h. In addition, there is 1 ammonia synthesis plant with a capacity of 180,000 tons per year. A 220 kV substation will be built within the park. The total land area occupied by the project is 297,012.12 m2. Project investment: 2,549,779.3 thousand yuan, of which the amount invested in environmental protection measures is 51,826.5 thousand yuan. On October 26, 2022, the Development and Reform Bureau of Daan City officially approved the Daan wind and solar power-based green hydrogen production for ammonia synthesis integrated demonstration project (the wind power component). Daan’an Wind Power-based Green Hydrogen for Ammonia Production Integrated Demonstration Project (Wind Power Section): The construction scale involves the installation of 140 wind turbines, each with a capacity of 5.0 megawatts, resulting in a total capacity of 700 megawatts. Of this amount, 300 megawatts of power generated by the wind turbines will be used for local consumption without being fed into the grid, while the remaining 400 megawatts of power generated will be used locally and any excess will be supplied to the grid ; A new 220 kV step-up substation will be constructed, along with auxiliary facilities such as box transformers and collection lines, and 40 megawatt/80 megawatt-hour energy storage systems will be installed. Project investment: 3,351,220,600 yuan