Thread Content
The 10,000-ton/year integrated wind and solar hydrogen production project, undertaken by Sinopec Xinxing Inner Mongolia Green Hydrogen New Energy Co., Ltd., was officially launched recently. The project department has invested 2.588 billion yuan, of which 5.9 million yuan was allocated to environmental protection measures. The wind and solar power facility is located in Wushenzhao Village, Wushenzhao Town, Wushen Banner, Ordos City, Inner Mongolia Autonomous Region, while the hydrogen production plant is situated in the Tuk Industrial Park in Wushen Banner, about 55 km east of the facility. According to the introduction, the wind and solar power components of this project include a 27MW photovoltaic power generation facility and a 49.5MW wind power generation facility; the electricity generated is transmitted through transmission and distribution circuits to the hydrogen production station where it is used for water electrolysis to produce hydrogen ; The hydrogen production facility is equipped with 28 alkaline electrolyzers, each with a capacity of 1000 Nm3/h. For hydrogen storage, there are 4 low-pressure tanks with a capacity of 2000 cubic meters each. The green hydrogen produced by water electrolysis is supplied to the local company Zhongtian Hechuang for use as a raw material in chemical manufacturing, and all the green oxygen is also provided to Zhongtian Hechuang for its use.
【HaiChuan Hydrogen Energy】Construction begins on a 3.8-billion-yuan project for producing green ammonia through wind and solar power in Ejin Horo Banner, Inner Mongolia https://bbs.hcbbs.com/thread-4060940-1-1.html (Source: HuaHaiChuanLiu – HaiChuan Network)
We welcome everyone to participate more in the forum discussions