Thread Content
The lifting of the cold box for the 40,000 Nm3/h air separation unit at Liuhua Chemical Industry Company, part of Gansu Jingyuan Coal Industry, has been completed. Author/Source: Modern Coal Chemical Engineering. Date: November 9, 2023. Clicks: 136. On October 30, the last section of the cold box for this air separation unit was lifted, completing its installation and marking a new stage in the project’s construction process. The work was carried out by the Northwest Branch of China National Chemical Engineering Corporation No. 11 Construction Co., Ltd. The air separation cold box is 64.75 meters tall. To ensure the smooth progress of the lifting operations, the project team carried out extensive technical preparations prior to lifting, including actual measurements of the lifting site and selection of the appropriate steel cables. In addition, all personnel involved in the construction were given on-site technical and safety instructions before the equipment was lifted. Ultimately, a 320-ton crawler crane was used as the main lifting device, with a 100-ton truck crane used to assist with the lifting process. During the lifting process, the owner and the supervisors were present to observe the entire operation. They gave high praise for the effective organization of the lifting process and the clear division of tasks, which greatly boosted the morale of all employees on site to complete the project construction tasks with high quality. This demonstrated once again the excellent tradition of 11th Construction Group, which places top priority on quality and service. Next, the project team will plan meticulously and manage scientifically, continuing to deliver high-quality projects through excellent service and sophisticated skills. (Editor: Wang Xiaojing) 1. Project owner: Liuhua Chemical Co., Ltd., Jingyuan Coal Industry Group. 2. Project name: Installation of the 40,000 Nm3/h (O2) air separation unit for the first phase of the Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) project. 3. Location of construction: No. 201, Sujiadun, Dongxing Village, Wangxian Town, Baiyin District, Baiyin City, Gansu Province