Thread Content
The Changchun-Shijiazhuang 219.87km gas pipeline project (Zhangjiakou-Shijiazhuang section) is located in Laiyuan County and Fuping County of Baoding City, Hebei Province, as well as Xingtang County of Shijiazhuang City. It was invested in and constructed by the First Branch of China National Petroleum Pipeline Bureau Engineering Co., Ltd. The second contract section of the Changchun-Shijiazhuang gas pipeline project (Zhangjiakou-Shijiazhuang segment) has a length of 219.87 km; the main pipeline stretches for 1422 mm, with a total pipe diameter length of 215.12 km. It passes through Laiyuan County and Fuping County in Baoding, as well as Xingtang County, Lingshou County, and Luquan District in Shijiazhuang ; The interconnection between Shaanxi-Beijing Lines 2 and 3 features pipes with a diameter of 1016 mm, and the total length is 4.2 km ; The E’ancang interconnection has a pipe diameter of 1,219 mm and a total length of 0.55 km. Five stations are located along the line, namely Laiyuan West Compressor Station, Laiyuan South Interconnection Station, Fuping Distribution Station, Lingshou Distribution Station, and Luquan East Compressor Station; five new valve rooms will also be constructed. 7 pipe jacking crossings of large and medium-sized rivers along the route, with a total length of 2.13 km ; Tunneling of a large river by shield machine across 1 section with a total length of 1.49 km ; The mountain tunnel passes through 32 sections with a total length of 48.05 km ; Mountain tunnel boring passes through 9 locations, with a total length of 1.79 km ; One cultural relics jacking passage, with a total length of 0.2 km ; 37 pipe jacking crossings of highways, with a total length of 2.57 km ; 22 pipe jacking crossings across small water bodies, with a total length of 2.44 km ; The total length of the pipe jacking passage at 1 location is 0.2 km ; 290 locations where trenches were dug and covered with covers; total length: 6.24 km ; Excavation through 190 locations such as small rivers, gullies, ditches, and ponds, with a total length of 17.96 km ; The railway passes through 2 locations ; Optical cables pass through 40 locations ; Underground pipelines pass through 42 locations. The total project investment is currently unknown.
[History of Haichuan Chemical] The alarm keeps ringing | A review of the top 10 worst engineering accidents in global history ④ Collapse of the roof at the Katowice Trade Hall https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720210 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【History of Haichuan Chemical】The alarm remains ringing | A roundup of the top 10 worst engineering accidents in global history ① The collapse of a building in Savar, Bangladesh https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720206 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsealed holes in firewalls between different fire compartments (such as those caused by electrical wiring and piping passing through) https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720283 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3117–2026: The steam turbines developed by Hangzhou Turbine Group for 120,000-class air separation units have completed full-load no-load operation tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720077 (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Safety Management and Standardization of Special Equipment】When conducting on-site inspections of organic heat carrier boilers, are you focusing on the right key points? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720425 (Source: Haichuan Chemical Engineering Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Little Teahouse】 During the meeting, you were questioned: “Why didn’t you notice it in advance?” ”, how should you respond with high emotional intelligence? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720574 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2031 to 2026, the Luoyang R&D Center developed an “exergy analysis” model technology for atmospheric and vacuum distillation units. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720568 (Source: Haichuan Chemical Industry Forum (HCBBS))