On January 15th–16th, the hydrogenation reactor II R-0302, hydrogenation reactor I R-0301, and stripping tower C-0501 of the Huajin Project’s coal and diesel hydrogenation unit, as well as tower C-104 of the gasoline hydrogenation unit’s C6 separation system, were all successfully lifted into place in one go. This fulfilled the planned target of \"four lifts in two days,\" enabling rapid installation of the large vertical equipment. The hydrogenation reactor II R-0302 of the coal diesel hydrogenation unit has a lifting weight of 115.8 tons; for lifting, a 350-ton crawler crane is used as the main lifting device, while a 250-ton crawler crane is used to assist with lifting the rear part of the reactor. The hydrogenation reactor IR-0301 in the coal and diesel hydroprocessing unit has a lifting weight of 246 tons; it is the heaviest equipment in this unit. For its lifting, a 350-ton crawler crane is used as the main lifting device, while a 250-ton crawler crane is used to assist with lifting the rear part of the reactor. The lifting weight of the stripper tower C-0501 in the coal diesel hydrogenation unit is 50.3 tons; for lifting, a 350-ton crawler crane is used as the main lifting device, while a 250-ton crawler crane is used to assist with lifting. The lifting weight of tower C-104 in the gasoline hydrogenation unit’s C6 separation section is 169 tons; for lifting, a 500-ton crawler crane is used as the main lifting device, while a 250-ton crawler crane is used to assist with lifting the tail end of the tower.
It’s extremely cold in the northeast, with water turning to ice instantly – so why go ahead and carry out high-risk operations like lifting?
【HaiChuan Spring Festival Red Envelope】On the 28th day of the 12th lunar month, happily paste window decorations https://bbs.hcbbs.com/thread-5679237-1-1.html (Source: HaiChuan Chemicals Forum [Hua HaiChuan Liu])