Jiabingwu Hydrogen Alcohol New Energy Investment (Baotou) Partnership (Limited Partnership) invested 8.7 billion yuan in the Tuomote Youqi wind and solar hydrogen alcohol integration project (the consumption side)
Thread Content
Project Name: Jia Bing Wu Hydroxyl New Energy Investment (Baotou) Partnership (Limited Partnership) – Tumet Right Banner Integrated Wind and Solar Hydrogen and Hydroxyl Production Project (Consumption Side)Launch Date: September 8, 2025
Region: Inner Mongolia
Industry/Project Type: Electricity/Wind Power/Wind Energy; Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Chemical Raw Materials ; New infrastructure and new industries / New industries / Hydrogen energy. Project owner: Jia Bing Wu Hydrogen Alcohol New Energy Investment (Baotou) Partnership (Limited Partnership). Total investment amount: 870 million yuan. Current progress: Project registration completed. Location of construction: North of Weiyi Road, in the New Industrial Park of Tumote Right Banner, Baotou City, Inner Mongolia Autonomous Region. Scope of construction: The project covers an area of 460 mu, with a new construction area of 300,000 square meters. Construction contents: 1. Construction of a new production system for 180,000 tons per year of \"green hydrogen\": Installation of 145*2000 Nm3/h alkaline electrolyzer units for hydrogen production via water electrolysis, including electrical equipment such as rectifiers and transformers, purification equipment, separation systems, as well as auxiliary systems such as compressed air and cooling water; in addition, 70*2000 m3 high-pressure hydrogen storage tanks, 40*2000 m3 oxygen storage tanks, and related supporting facilities ; 2. Construction of a new production system for 480,000 tons per year of \"green methanol\": One set of carbon dioxide collection and storage equipment, one large-scale green methanol synthesis unit, one distillation unit, 5*10,000 m3 of methanol storage tanks, and related supporting facilities ; 3. Construction of a new production system with an annual output of 650,000 tons of \"solid green hydrogen powder\": New gas compression equipment, mixing equipment, metering equipment, reaction vessels, heating and cooling systems, separation and purification equipment, testing and analysis equipment, safety and environmental protection equipment, as well as supporting facilities. Production process: 1. Hydrogen production via alkaline electrolysis of water. 2. CRI’s production of green and low-carbon methanol via electrolytic water splitting to produce hydrogen and carbon dioxide capture from air (ETL patented technology). 3. Solid hydrogen powder is synthesized using green hydrogen and light metal-based salts. Progress milestone: On 2025-09-05, the registration for the Tumote Right Banner wind and solar hydrogen production project (the consumption side) was approved by the Jia Bing Wu Hydrogen Alcohol New Energy Investment (Baotou) Partnership (Limited Partnership). (Project registration completed)