Total investment of 449 million yuan! Announcement on the First Phase of the 30GW New Energy Green Hydrogen Production and Transport Pipeline Project

2026-04-01View Original

Thread Content

Total investment of 449 million yuan! Announcement on the First Phase of the 30GW New Energy-Based Green Hydrogen Production and Transport Pipeline Project: On March 26, information regarding the social stability risk assessment for the first phase of this project (the Inner Mongolia section) was made public. According to the public announcement, the first phase of the 30GW new energy-based green hydrogen production and transportation pipeline project (Inner Mongolia section) is located in Tuk Town, Wushen Banner, Ordos City, Inner Mongolia Autonomous Region. The project developer is Shaanxi Hydrogen Energy Industry Development Co., Ltd. The hydrogen transmission pipeline for this project has a length of 19.6 km, a diameter of DN500, a design pressure of 6.3 MPa, and is made of L290QH steel (seamless pipe). The total investment in project construction is approximately 449.3846 million yuan, allocated according to the length of the route (with the Wushen Banner section accounting for 53.4%), and the estimated investment within the domestic territory is around 239.9746 million yuan. The construction period for this project is from 2026 to 2028. In accordance with the requirements set out in the document titled \"Notice on the Issuance of Four Regulatory Documents by the Stability Maintenance Work Leading Group of the Inner Mongolia Autonomous Region Party Committee and the Party Committee of the Inner Mongolia Autonomous Region, including the ‹Operational Procedures for Assessing Social Stability Risks Related to Major Projects in the Inner Mongolia Autonomous Region (Trial)›\" (Nei Wen Fa [2016] No. 1), the relevant details regarding the social stability risk assessment for this project are announced as follows: I. Brief description of the construction project: (1) Project name: Phase I of the 30GW new energy-based green hydrogen production and transportation pipeline project (Inner Mongolia section). (2) Project owner: Shaanxi Hydrogen Energy Industry Development Co., Ltd. (3) Scale and scope of the project: The length of this hydrogen transportation pipeline is 19.6 km; the pipe diameter is DN500, the design pressure is 6.3 MPa, and the material used for the pipes is L290QH (seamless steel pipes). (IV) Total project investment and sources of funding: The total investment required for the construction of this project is approximately 449.3846 million yuan, which is allocated based on the length of the route (with the Wushen Banner section accounting for 53.4%); it is estimated that the investment within China’s territory will be around 239.9746 million yuan. The funding sources are the company’s own funds and bank loans. (5) Location of construction: Within Tuk Town, Wushen Banner, Ordos City, Inner Mongolia Autonomous Region. (VI) Construction period: The construction period for this project is from 2026 to 2028. II. Investigation Methods, Contents, and Scope (1) Investigation methods. Opinions from the stakeholders of the proposed project and relevant departments will be widely sought through methods such as issuing public announcements, visiting project-related stakeholders, conducting surveys, and holding public forums ; (II) Investigation content. It focuses on aspects such as the legality, rationality, feasibility, and controllability of the proposed project, conducting a comprehensive analysis and systematic evaluation of the potential social stability risks associated with its construction and implementation. (III) Scope of the investigation. Taking into account the content and scale of the proposed project, all factors that affect the interests of stakeholders and may pose risks to social stability are included in the scope of investigation, including any negative impacts that may arise during the implementation of the project.
Reply #22026-04-01
Sea [Haichuan Chemical Technology Documentation] Why do steel beams need to be arched, and how is the arching value determined? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716807 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #32026-04-01
Sea [Haichuan Chemical Technology Documentation] Why do steel beams need to be arched, and how is the arching value determined? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716807 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-04-02
【3D Process Flow】Summary Post--Petroleum Refining Process Flow Diagram 08--Typical Processes for Crude Oil Desalination and Dewatering https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716875 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-04-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】The First Demonstration Application of 40MW-Class Super-High Power Motors in the Coal Chemical Industry in China from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716931 (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #62026-04-03
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Pipe Supports Positioned on Pipe Welds https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716996 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-03
【History of Haichuan Chemical】 Shenyang Blower Factory (original location) https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717000 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-04-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】The First Demonstration Application of 40MW-Class Super-High Power Motors in the Coal Chemical Industry in China from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716931 (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #92026-04-04
【3D Process Flow】Summary Post--Petroleum Refining Process Flow Diagrams 12--Segmented Continuous Oil Refining Process Flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717048 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-04-05
【Ten Years of Rapid Development in Chemical Equipment】From 2033 to 2026, Zhongtian Hechuang successfully developed the new ultra-fine material LD6000 polyethylene resin, filling a gap in China’s market. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716936 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-04-05
【HaiChuan Equipment Guessing Game】How big a pot is needed to wash all these dish balls? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717061 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.