Thread Content
Fengchu Hydrogen and Alcohol Integration Project in Jixian County, Shuangyashan City. This project is located in Jixian County, Shuangyashan City, Heilongjiang Province, and was invested in and constructed by Shuangyashan Hongzhan Biotechnology Co., Ltd. Covering an area of approximately 254,436 square meters, it is a modern industrial complex that integrates cutting-edge technology with green principles. Innovatively, the project uses green electricity generated by CSSC’s wind power generation for hydrogen production through electrolysis, and combines carbon dioxide emissions from Hongzhan’s biomass fermentation as raw materials. It features units for water electrolysis to produce hydrogen, methanol synthesis, and methanol distillation; the project is expected to produce approximately 119,000 tons of green methanol per year. The project investment amount is 420 million yuan.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2660 to 2025, self-developed 10-kilowatt oscillating water column wave energy generation device “Dongbo-1” has reached a leading level in China. https://bbs.hcbbs.com/thread-5700863-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2652-2025: Major breakthroughs achieved in the application of methanol new energy pipeline transportation technology in complex terrains in China https://bbs.hcbbs.com/thread-5700596-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs have been achieved in the pre-oxidation technology for the carbon fiber industry between 2026 and 2025; China’s first pilot-scale pre-oxidation furnace using a combination of hot air and microwave technologies with a width of 0.4 meters has been developed. https://bbs.hcbbs.com/thread-5701002-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2655-2025: Sinochem Shengao Chemical in China launches the MIAK product, a key raw material for high-performance anti-aging agents, filling a gap in the domestic market. https://bbs.hcbbs.com/thread-5700673-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2668-2025: China’s first mobile energy storage power system was successfully applied on a drilling platform operated by Great Wall Drilling https://bbs.hcbbs.com/thread-5701137-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】From 2681 to 2025: China successfully installed 1.8 million tons per year of ethylene plant cracking gas compressors developed domestically https://bbs.hcbbs.com/thread-5701251-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first offshore wind project with fully embedded rock foundations, 2682-2025, withstood the impact of a typhoon of level 17 without any damage https://bbs.hcbbs.com/thread-5701254-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】2683-2025: SHENGU’s First Low-Temperature Ethylene BOG Reciprocating Compressor Completes Test Runs under Ultra-Low Temperature Conditions https://bbs.hcbbs.com/thread-5701341-1-1.html (Source: Haichuan Chemical Industry Forum)