HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Xinjiang Xinlianxin Energy and Chemical Co., Ltd. in Changji, Xinjiang: Green and low-carbon transformation project with a total investment of 636,314 million yuan

2025-12-21View Original

Thread Content

Green and Low-Carbon Transformation Project of Xinjiang Xinlianxin Energy Chemical Co., Ltd. This project is located in Manas County, Changji, Xinjiang, and was invested in and constructed by Xinjiang Xinlianxin Energy Chemical Co., Ltd. Construction scale and main contents: The total land area is 892 mu, involving the construction of a new production line capable of producing 1.35 million tons per year of high-efficiency nitrogen-potassium compound fertilizers, as well as 80,000 tons per year of polyoxymethylene, along with related supporting facilities ; A new facility with an annual production capacity of 300,000 tons of liquid carbon dioxide will be built, along with related auxiliary facilities, and the existing wastewater treatment plants will be upgraded. The total investment for the project is 6,363.14 million yuan.
Reply #22025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-21
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-21
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsecured and Not Properly Sealed Pipe Insulation Foil https://bbs.hcbbs.com/thread-5708978-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-21
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-21
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production Permit https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-22
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
Reply #92025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-23
【Ten Years of Rapid Development in Chemical Equipment】2891-2025: Filling Technical Gaps! ! ! Our country conducted the first full-scale test of leak-induced jet fire in high-pressure pure hydrogen pipelines https://bbs.hcbbs.com/thread-5707712-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #112025-12-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.