Thread Content
According to the official website of the Management Committee of Xinjiang Zhundong Economic and Technological Development Zone, on September 20, the 2 billion cubic meters per year coal-to-natural gas project operated by TBEA Xinjiang Zhuneng Chemical Co., Ltd. began construction at the Jiangjunmiao Industrial Park in the same development zone. The total investment in this project is 17 billion yuan, and it covers an area of 197 hectares. The construction includes main facilities such as air separation, gasification, purification, and methanation. At present, the project has received approval from the National Development and Reform Commission as well as the environmental impact assessment approval from the Ministry of Ecology and Environment. It is expected that the foundation work for the main facilities will be completed by the end of this year, the project will be finished by the end of 2026, and it will go into full operation in 2027. According to a statement released by TBEA on April 1, the company holds coal reserves of over 12 billion tons in the Zhundong region, with an approved coal production capacity of 74 million tons per year, giving it an advantage in terms of low-cost coal supply. The coal-to-gas project is expected to convert 5.7974 million tons of raw coal per year, with a natural gas production capacity of 2.054 billion cubic meters per year; it will also produce by-products such as coal tar, middle oil, crude benzene, and ammonium sulfate. It is reported that the Zhundong coal field is China’s largest integrated coal field, with estimated coal reserves of 390 billion tons. In recent years, thanks to its abundant coal resources, the Zhundong Development Zone has made significant progress in the coal chemical industry. So far this year, various coal chemical projects have been launched, including the Shandong Energy Yankuang Xinjiang Energy Chemical Zhundong Coal Chemical Integration Project, with a planned total investment of 33.8 billion yuan; the Energy Zhundong project, which aims to produce 2 billion cubic meters of coal-derived natural gas per year, and the Dongfang Hope Group’s Zhundong Coal, Electricity, and Chemicals Integration Project, with a total investment of 19 billion yuan.
【HaiChuan Safety Discussion】What are the useful applications of AI robots in chemical plants that merit development? https://bbs.hcbbs.com/thread-5701773-1-1.html (Source: HaiChuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】New Advances in the Research and Development of Liquid Hydrogen Production Equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】New Advances in the Research and Development of Liquid Hydrogen Production Equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】World-leading transformative technology for dehydration through coupled reactions of solid materials, 2698–2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The project under the key research and development program 2699-2025, titled “Research on Key Equipment for the Production, Storage, Transportation, and Refueling of Liquid Hydrogen sowie Related Safety Aspects,” has successfully passed the comprehensive performance evaluation. https://bbs.hcbbs.com/thread-5701769-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2705-2025 Research and Demonstration Project on Key Technologies for Large-Scale Advanced Electrical Energy Storage – the 50 megawatt/100 megawatt-hour digital energy storage demonstration project – has passed the acceptance review. https://bbs.hcbbs.com/thread-5701879-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, the total length of submarine oil and gas pipelines in China will exceed 10,000 kilometers. https://bbs.hcbbs.com/thread-5702037-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Haichuan Explores the World】What is a sand battery? https://bbs.hcbbs.com/thread-5702064-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2000V photovoltaic demonstration facility was inaugurated in Wenchang, Hainan, between 2026 and 2025; the Datang Hainan 2000V demonstration project was launched simultaneously. https://bbs.hcbbs.com/thread-5701880-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The heavy oil catalytic cracking (RTC) technology developed independently by the Shih Chien Institute from 2008 to 2025 converts low-quality heavy oil, which has a large volume but high costs, into light olefins. https://bbs.hcbbs.com/thread-5701894-1-1.html (Source: Haichuan Chemical Industry Forum)