Thread Content
A joint venture affiliated with China Energy Engineering Group has signed a contract for a new energy turnkey project in Saudi Arabia worth approximately 19.554 billion yuan. A statement issued by China Energy Engineering Group shows that a consortium formed by its subsidiaries China Energy Engineering International Construction Group Co., Ltd., China Energy Engineering Group Guangdong Thermal Power Engineering Co., Ltd., and China Electric Power Engineering Consulting Group Northwest Electric Power Design Institute Co., Ltd., has signed three contracts for new energy EPC projects with Saudi International Electricity and Water Company, Saudi Public Investment Fund, and Saudi Aramco Electricity Company. The total value of these contracts is approximately 2.745 billion US dollars, which is equivalent to around 19.554 billion yuan. The announcement states that the contracts signed by China Energy Engineering Group this time include 3GW of wind power project works as well as 2GW of photovoltaic project works. The details are as follows: The general contract for the construction of Shakira 1GW wind power project, phase 5, under Saudi PIF, has a contract value of 663 million US dollars, with a construction period of 26 months ; General contract for the construction of Phase 5 of Saudi PIF’s Strata 2GW wind power project; contract value: 1.251 billion US dollars; project construction period: 30 months ; General contract for the EPC of Saudi PIF’s Phase 6 Foresight 2GW photovoltaic project, with a contract value of $831 million ; The project construction period is 26 months.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From Reliance on Imports to Global Leadership: 6 Years of Efforts to Develop Helium, the \"Blood of Industry\", 2726–2025 https://bbs.hcbbs.com/thread-5702633-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】2727–2025: High pressure to reach 10 MPa! Zhongneng Dayou has successfully developed a multi-field coupling testing device for hydrogen production using 100kW-class PEM electrolyzers. https://bbs.hcbbs.com/thread-5702702-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, CNPC Pipeline Bureau successfully developed an intelligent anti-corrosion construction robot for storage tank exteriors. https://bbs.hcbbs.com/thread-5702707-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】The first AI optimization model for methanol distillation units in China was put into operation at Yulin Energy Chemical Complex in Shaanxi from 2029 to 2025. https://bbs.hcbbs.com/thread-5702720-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】The first AI optimization model for methanol distillation units in China was put into operation at Yulin Energy Chemical Complex in Shaanxi from 2029 to 2025. https://bbs.hcbbs.com/thread-5702720-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】2730-2025: The world’s first set! New breakthrough achieved in the demonstration plant for producing acid and cement from third-generation phosphogypsum https://bbs.hcbbs.com/thread-5702721-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The first intelligent inspection robot for storage tank bottoms in the petrochemical industry, model 2731-2025, has been successfully put into practical use. https://bbs.hcbbs.com/thread-5702794-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, CNPC developed China’s first photovoltaic hydrogen production facility with a capacity measured in square meters, and carried out the first demonstration of its continuous operation in outdoor conditions. https://bbs.hcbbs.com/thread-5702805-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2034, the world’s first industrial-scale solar thermal synthetic fuel project, “DAWN”, began operational testing. https://bbs.hcbbs.com/thread-5702880-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2034, the world’s first industrial-scale solar thermal synthetic fuel project, “DAWN”, began operational testing. https://bbs.hcbbs.com/thread-5702880-1-1.html (Source: Haichuan Chemical Industry Forum)