ITAI Yili Energy Co., Ltd.’s 1 million tons per year coal-to-oil demonstration project: procurement of materials and tender for installation work

2025-10-14View Original

Thread Content

Project Name: Yitai Ili Energy Co., Ltd.’s 1 million tons per year coal-to-oil demonstration project
Launch Date: October 14, 2025
Location: Xinjiang
Industry/Project Type: Chemicals and pharmaceuticals / Fuel processing such as petroleum and coal / Modern coal chemical industry
Project Owners: Yitai Ili Energy Co., Ltd., Inner Mongolia Yitai Coal Co., Ltd.
Total Investment: 2,104.3 million yuan
Current Progress: Bidding for installation work
Construction Location: Yinan Industrial Park, Chabuchar Xibe Autonomous County, Ili Kazakh Autonomous Prefecture, Xinjiang Uygur Autonomous Region
Project Scope: Upon completion, the project will produce a total of 1.0582 million tons per year of products such as alkylbenzenes, high-carbon alcohols, and high-quality light hydrocarbons; by-products include mixed alcohols and sulfur. Progress milestone: October 12, 2025 – Announcement of competitive negotiation process for the installation work in Area 1 of the gasification framework for Sanhua Jian-Yitai Ili Energy Co., Ltd.’s 1 million tons per year coal-to-oil demonstration project (installation construction tender).
October 12, 2025 – Announcement of competitive negotiation process for the installation work related to coal slurry preparation (coal grinding plant and feeding plant) for the same project (installation construction tender).
October 11, 2025 – Announcement of competitive negotiation process for the installation work in Area 2 of the gasification framework for Sanhua Jian-Yitai Ili Energy Co., Ltd.’s 1 million tons per year coal-to-oil demonstration project (installation construction tender).
October 10, 2025 – Announcement of competitive negotiation process for the electrical and instrumentation work related to the air separation unit in this project (supply tender).
October 09, 2025 – Announcement of competitive negotiation process for the custom fabrication and installation work related to this project (installation construction tender)
Reply #22025-10-14
【Ten Years of Rapid Development in Chemical Equipment】The first AI optimization model for methanol distillation units in China was put into operation at Yulin Energy Chemical Complex in Shaanxi from 2029 to 2025. https://bbs.hcbbs.com/thread-5702720-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-10-14
【Ten Years of Rapid Development in Chemical Equipment】2730-2025: The world’s first set! New breakthrough achieved in the pilot plant for producing acid and cement from third-generation phosphogypsum https://bbs.hcbbs.com/thread-5702721-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-10-14
【Ten Years of Rapid Development in Chemical Processing Equipment】The first intelligent inspection robot for storage tank bottoms in the petrochemical industry, model 2731-2025, has been successfully put into practical use. https://bbs.hcbbs.com/thread-5702794-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-10-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first industrial-scale solar thermal synthesis fuel project, “DAWN”, began operational testing from 2024 to 2025. https://bbs.hcbbs.com/thread-5702880-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-10-16
【Ten Years of Rapid Development in Chemical Processing Equipment】Dry separation systems for sulfate alkylation, 2025–2035: Complete technical solutions https://bbs.hcbbs.com/thread-5702881-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-10-17
【Ten Years of Rapid Development in Chemical Equipment】The first VOCs (volatile organic compounds) flare gas recovery system for China’s coal chemical industry was successfully put into operation at Xinjiang Xinye Energy Chemical in the period 2027–2025. https://bbs.hcbbs.com/thread-5702973-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-10-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】2738-2025: \"Shenmu Machinery’s Development of China’s First Eight-Stage Multi-Axis Carbon Dioxide Compressor\" Contributed to the Successful Operation of the World’s Largest Coal-Fired Power Plant Carbon Capture Project https://bbs.hcbbs.com/thread-5702987-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-10-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】2738-2025: \"Shenmu Machinery’s Development of China’s First Eight-Stage Multi-Axis Carbon Dioxide Compressor\" Contributed to the Successful Operation of the World’s Largest Coal-Fired Power Plant Carbon Capture Project https://bbs.hcbbs.com/thread-5702987-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-10-18
【Ten Years of Rapid Development in Chemical Engineering Equipment】2739-2025: Accelerating progress in overcoming scientific challenges and technical bottlenecks; the Chinese Academy of Sciences launches an international scientific initiative for the biological conversion of carbon dioxide https://bbs.hcbbs.com/thread-5703002-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-10-18
【Ten Years of Rapid Development in Chemical Equipment】2741-2025 – Amazing! XCMG and Sinopec successfully signed a contract for the world’s first 14,000-ton gantry crane. https://bbs.hcbbs.com/thread-5703016-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.