The project for the production of 100,000 tons per year of 1,4-butanediol, carried out by Shaanxi Yichuan County Industrial Park Investment, Development and Construction Co., Ltd., has been registered

2025-11-05View Original

Thread Content

Recently, the annual production of 100,000 tons of 1,4-butanediol project carried out by Yichuan County Industrial Park Investment, Development and Construction Co., Ltd. has been registered.   Project Name: Yichuan County Industrial Park Investment, Development and Construction Co., Ltd.’s 100,000-ton-per-year 1,4-butanediol production project
Launch Date: October 28, 2025
Region: Shaanxi
Project Owner: Yichuan County Industrial Park Investment, Development and Construction Co., Ltd.
Total Investment: 1.9 billion yuan
Construction Location: An area of 100 mu north of the Niujia Dian area in Yan’an City, Shaanxi Province
Project Details: The production capacity of the BDO facility in this project is set at 100,000 tons per year; in addition, there will be a 40,000-ton-per-year facility for producing acetylene from natural gas, a 100,000-ton-per-year facility for producing methanol using the acetylene off-gas recovery method, and a 200,000-ton-per-year facility for producing formalin (37%). The annual operating time is 8,000 hours in each case. BDO mainly supplies downstream plants for PBS series polyesters, PTMEG, etc. Excess acetylene feedstock can be supplied to the alkyne alcohol plant, while excess methanol is sold externally. The project involves the construction of a facility with an annual production capacity of 100,000 tons of BDO (including units for acetylene, methanol, and formaldehyde), with a total investment of 1.9 billion yuan.
Reply #22025-11-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-05
【HaiChuan Discussion】The client’s demands are getting higher and higher, while the prices kept being pushed lower. Can something made under such conditions pass the acceptance tests? https://bbs.hcbbs.com/thread-5704576-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The core equipment for China’s first 400,000 tons/year LAO production facility – the high-purity C4 and C6 product towers – was inspected and accepted in Dalian. https://bbs.hcbbs.com/thread-5704530-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2800 to 2025: Kunming University of Science and Technology, in collaboration with Guangdong, developed China’s first mobile zero-carbon hydrogen production and power generation unit, which was showcased at the forum. https://bbs.hcbbs.com/thread-5704545-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first 6MPa 3,500-ton gasification furnace developed as part of the Space Long March project was successfully ignited during the pilot operation of the integrated project for clean and efficient utilization of resources in Xinjiang’s Zhongneng Lvyuan area. https://bbs.hcbbs.com/thread-5704592-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful trial production of HE700M high-strength, extra-thick welded H-beams by Shansteel Co., Ltd. from 2024 to 2025 https://bbs.hcbbs.com/thread-5704594-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-11-08
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed evaluation. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-09
【Ten Years of Rapid Development in Chemical Equipment】From 2806 to 2025: Dalian Institute of Chemical Physics’ new fixed-bed process for producing hydroquinone via phenol and hydrogen peroxide hydroxylation passes the scientific and technological achievement evaluation. https://bbs.hcbbs.com/thread-5704724-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.