HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Public announcement on the registration of the industrial gas island project at Huizhou New Materials Industrial Park, Air Liquide (Huizhou) Gas Co., Ltd

2025-11-11View Original

Thread Content

On November 10, the registration announcement for the industrial gas island project at Huizhou New Materials Industrial Park of Air Liquide (Huizhou) Gas Co., Ltd. was released. The project is located at plot XCL-04-56 in Baihua Town, Huidong County, Huizhou City, covering an area of approximately 23,000 square meters, with a construction area of around 2,800 square meters. The total investment for the project is 357 million yuan. The project will build a new production facility with a capacity of 450 tons per day, as well as a nitrogen liquefaction facility with a capacity of 800 tons per day. As well as the supporting auxiliary facilities such as power distribution and circulating water systems.
Reply #22025-11-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful First Operation of the Pilot Plant for Producing Liquid Fuels via Hydrogenation of High-Temperature Coal Tar, 2813–2025, Qingdao Institute of Energy, Chinese Academy of Sciences https://bbs.hcbbs.com/thread-5704913-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-11-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】2794–2025: Chinese scientists overcome the high-carbon-emission challenge in Fischer-Tropsch synthesis, giving this century-old process a low-carbon future https://bbs.hcbbs.com/thread-5704322-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】2794–2025: Chinese scientists overcome the high-carbon-emission challenge in Fischer-Tropsch synthesis, giving this century-old process a low-carbon future https://bbs.hcbbs.com/thread-5704322-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】2796-2025: Construction Management of Ethylene Process Piping Projects at Huanqiu Liu Jian’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-11
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Donghua Company’s graphene-based anti-corrosion coatings produced via gas-phase synthesis were included in the list of innovations recommended by central state-owned enterprises. https://bbs.hcbbs.com/thread-5705057-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2×15 megawatt supercritical carbon dioxide-based waste heat power generation demonstration project was connected to the grid between 2015 and 2025. https://bbs.hcbbs.com/thread-5704984-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-11-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 2×15 megawatt supercritical carbon dioxide-based waste heat power generation demonstration project was connected to the grid between 2015 and 2025. https://bbs.hcbbs.com/thread-5704984-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #102025-11-13
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-11-13
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed the evaluation process. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.