Thread Content
Over the past few days, the construction site of the BDO—PBAT integrated project carried out by Wuhai Guangjin New Materials Co., Ltd. (hereinafter referred to as the “Company”) in the Wuhai High-Tech Industrial Development Zone has been bustling with activity. Construction machinery such as cranes, loaders, and excavators move around as work progresses. Nearly 400 workers worked together in an organized manner, carrying out tasks such as the prefabrication of utility tunnels and the welding of steel structures. They strived to meet deadlines, advance progress, and ensure quality, using their hard work to drive the construction of the project and make every effort to achieve the annual targets. The total investment planned for the BDO—PBAT integrated project of Wuhai Guangjin New Materials Co., Ltd. is approximately 7.25 billion yuan, with construction taking place in two phases. The first production line with an annual capacity of 300,000 tons of BDO began operations in April 2023. Since resuming work at the end of February this year, the project construction has accelerated, and 70% of the total workload has now been completed. The main process units and equipment pipelines have been installed, and efforts are being made at full speed to complete the installation of electrical instruments, with the goal of completing the project and putting it into operation by October this year. Li Kewu, deputy general manager of BDO’s project team, said, “Moving forward, we will continue to uphold a pragmatic work style, further clarify responsibilities and strengthen support, so as to fully advance the project construction.” At the same time, in line with the needs of industrial development, we are making great efforts to extend, supplement, and strengthen the industrial chain. Focusing on cost reduction and efficiency improvement, we continuously enhance our production technology levels and the core competitiveness of our products, striving to set a benchmark in the BDO industry and become a leader within the sector. ”To ensure the smooth progress of the project, the relevant departments in our city have taken proactive measures to provide support, addressing the needs of enterprises precisely and offering substantial assistance in areas such as procedure handling and resource provision. On March 19, the project successfully completed the task of delivering 360,000 kVA of power, and the accompanying power supply system was put into full operation. This not only provides a solid energy supply for key stages such as subsequent equipment commissioning and trial operation with feedstock, but also marks a crucial step forward in the project’s progress toward completion and operation. Once the project is completed and put into operation, it will successfully establish a complete industrial chain of \"coal, limestone – calcium carbide – BDO – biodegradable plastics\", which is of great significance for creating jobs and promoting the improvement and upgrading of the industry.
[Grand Discussion on Haichuan’s Modular Installation] Summary thread – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Missing Handles and Wheels on Pipe Valves https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718812 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The pilot-scale plant for the bio-based furan dicarboxylic acid technology developed by Dalian Institute of Chemical Physics was successfully commissioned https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718433 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Essential】In metal materials, the α-phase, β-phase, γ-phase, and so on can always be seen. Do you know why they are named this way? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718856 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3082-2026 to Fill the Gaps. The first-phase project of Zhonghua Chemical Western New Materials, with a production capacity of 50,000 tons per year for ultra-high molecular weight polyethylene, completed its trial operation with a successful first batch of material feeding. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717659 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】The world’s first 5MW AEM hydrogen production system, model 3101-2026, has been installed, commissioned, and tested https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718929 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 3095 to 2026! China’s hydrogen pipeline project secures first order in Europe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718447 (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】3097-2026: China’s First Set! Construction begins on the nuclear power high-temperature medium-pressure steam supply test and verification platform project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718496 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3097-2026: China’s First Set! Construction begins on the nuclear power high-temperature medium-pressure steam supply test and verification platform project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718496 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))