Thread Content
On November 16, with the final set of fixing bolts tightened precisely, the last vacuum liquid argon storage tank at the air separation unit of Rongsheng New Materials Project in the Southwest Branch was successfully installed. This marked the completion of the construction of the core storage system for the air separation unit, laying a solid foundation for the subsequent joint testing and operational deployment of the entire facility. The left image shows the liquid nitrogen vacuum storage tank, while the right image shows the liquid argon vacuum storage tank. The core storage system of this air separation plant includes 2 liquid argon vacuum storage tanks, 5 liquid nitrogen vacuum storage tanks, 1 liquid oxygen vacuum storage tank, 1 liquid oxygen flat-bottomed storage tank, and 1 liquid nitrogen flat-bottomed storage tank. The two liquid nitrogen vacuum storage tanks being lifted this time weigh 170 tons each and are 37.5 meters tall ; The two vacuum liquid argon storage tanks, each weighing 178 tons and standing 32.3 meters tall, serve as the core equipment for low-temperature storage. Both are equipped with a double-layer vacuum insulation structure, which enables long-term stable storage of liquid nitrogen and liquid argon at -196°C. For this lifting operation, an 800-ton crawler crane is used as the main lifting device, while a 280-ton crawler crane is used to assist with the delivery process. As an indispensable \"gas supply hub\" in petrochemical systems, the air separation unit serves to provide the production processes with high-purity gases such as oxygen and nitrogen in a continuous and stable manner. Its core function is crucial, as it directly determines the feasibility, safety, and economic efficiency of subsequent production processes. Once the air separation unit of the Rongsheng New Materials project is completed, it will provide reliable gas supply for the main equipment of the project, helping to improve product quality and production efficiency. It holds great significance for helping the entire project achieve its goals of green and intelligent production.
【Common Issues in Haichuan Pipeline Design】For pipelines carrying substances such as ethyl acetate and methanol in tank areas, the spacing between these pipelines is less than 10 cm, and no equipotential bonding has been implemented. https://bbs.hcbbs.com/thread-5705733-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】For pipelines carrying substances such as ethyl acetate and methanol in tank areas, the spacing between these pipelines is less than 10 cm, and no equipotential bonding has been implemented. https://bbs.hcbbs.com/thread-5705733-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline welding robot for the period 2834–2025 has been put into use. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2028 to 2025, Lansi Group developed China’s first 90MPa ionic liquid hydrogen compressor, which underwent 90MPa hydrogen circulation pressurization tests. https://bbs.hcbbs.com/thread-5705737-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】2840-2025: Maoming Gravity Manufacturing and CNPC’s independently developed first set of modular polypropylene loop reactor systems https://bbs.hcbbs.com/thread-5705786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Equipment’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))