The first pressure testing cycle for the process pipelines of the Nantong Blue Sea New Materials pilot plant project was completed successfully in one attempt

2025-11-22View Original

Thread Content

On November 15, the pressure testing of the process pipelines in the desalinated water system of the western section of the utility tunnel at the Nantong Blue Sea New Materials pilot plant project, part of the fifth branch company, was successful on the first attempt. This marked the successful completion of the hydraulic pressure testing for the first set of process pipelines in this project, laying a solid foundation for the subsequent pressure testing of other systems. It is reported that the process pipeline system of this project comprises 236 pressure testing packages, covering 15 different test pressure levels, and is characterized by a wide range and complex interfaces. As the first process pipeline to undergo pressure testing in the project, the successful pressure testing of the West Zone demineralized water system serves as a \"crucial test\" for evaluating the project team’s capabilities in organizing pressure tests, their technical readiness, and their efficiency in on-site coordination. To ensure the safe and efficient progress of the first pressure testing phase, before carrying out the testing, project technicians conducted a thorough review of the testing area, operating conditions, and construction boundaries. They also checked each item of the documentation related to the pressure testing to guarantee that all technical documents were accurate and error-free. At the same time, professional calibration is carried out on key instruments such as pressure gauges and pressure-temperature recorders to ensure the accuracy and reliability of the test data. In light of the diverse pressure levels involved in the project, the project team developed a specialized pressure testing plan that specifies the gradient of pressure increase, the time required for maintaining stable pressure, key points for inspection, as well as emergency response procedures. Relevant personnel were briefed on the safety and technical aspects involved, ensuring that they were familiar with and understood the pressure testing process, operational requirements, and safety risks, thereby providing a solid safety and technical foundation for the testing operations. The successful completion of the pressure testing of the desalinated water system in the western area of the Nantong Blue Sea New Materials pilot plant project provides replicable experience for the large-scale pressure testing of the pipeline systems in subsequent phases of the project. Next, all team members involved in the project will use this successful pressure testing as an opportunity to accelerate the pressure testing of other systems as well as various subsequent construction tasks. By working together and overcoming challenges, they will strive to meet the project’s delivery deadlines, ensuring that the project is completed with high quality on schedule.
Reply #22025-11-22
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Equipment’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Equipment’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-11-23
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the excess pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas excess pressure power generation project – has been put into operation in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #82025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #92025-11-24
【Ten Years of Rapid Development in Chemical Processing Equipment】SINOPEC’s Research Institute of Petrochemical Technology’s high-efficiency catalytic cracking (RTC) technology was tested and validated at Zhenhai Refining & Chemical Complex from 2023 to 2025. https://bbs.hcbbs.com/thread-5705591-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #102025-11-24
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112025-11-25
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.