Thread Content
On November 10, the final section of the flare tower for the Algeria MTBE project, which was constructed under the EPC general contracting arrangement by the Sinopec Luoyang Engineering Company consortium, was accurately installed, marking the successful completion of the flare lifting work for this project. It is reported that the torch tower is 97 meters tall and weighs 129 tons; it has a slender structure, its center of gravity is relatively high, which requires high wind stability. The project team adopted a \"segmental assembly and overall lifting\" approach, dividing the tower and flare stack into 4 segments. After assembly and alignment were completed on the ground, a 400-ton crawler crane and a 120-ton truck crane worked together to lift and connect the segments step by step. From the first lifting operation on November 4th to the precise placement of the last section, the entire process took seven days, resulting in a perfect assembly in the air.
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: Hachuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Instead of a small and tall torch, it would be better to design it as a guyed torch.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Direct discharge of condensate water from gas compressors in a certain workshop (a serious safety hazard) https://bbs.hcbbs.com/thread-5706461-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))