HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The construction of Shandong Anshun Pharmaceutical Co., Ltd.’s 1901/1902 pilot plant facilities as well as the associated utility tunnels in the factory area, and the mechanical and electrical installation project for the 1704 tank farm, has officially commenced

2025-12-11View Original

Thread Content

Recently, the construction projects for Shandong Anshun Pharmaceutical Co., Ltd.’s 1901/1902 pilot production workshops, along with the associated utility tunnels in the factory area, and the mechanical and electrical installation work for the 1704 tank farm, officially commenced. Located in the Circular Economy Demonstration Park in Leling City, Dezhou Province, Shandong Province, this project is an important part of Qilu Pharmaceutical Group’s pilot platform for the research and development of high-end drugs. Upon completion of the project, it will promote the coordinated development of the pharmaceutical industry chain in the Leling Circular Economy Demonstration Park, help to establish an industrial cluster characterized by green manufacturing, and inject new momentum into the high-quality development of the county.
Reply #22025-12-11
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】The first national \"5G + Industrial Internet\" smart coking system was put into operation in 2025 – a project with an annual production capacity of 3.6 million tons of compacted coke. https://bbs.hcbbs.com/thread-5706895-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with completely independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-12
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72025-12-12
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-12-13
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for ceramsite using coal gangue on a scale of ten million tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: HCBBS Chemical Forum)
Reply #112025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that makes use of pressure energy was officially put into operation in Shaoxing, Zhejiang, from 2874 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.