On November 5, the Amiral mixture pyrolysis unit and refinery exhaust gas project in Saudi Arabia, constructed by the Saudi branch of China National Chemical Engineering 11th Construction Co., Ltd. with the participation of a chemical machinery and equipment manufacturing factory, reached a key milestone: the ultra-large C-2101 equipment, weighing 1,065 tons, standing 72 meters tall and having a diameter of 7.5 meters, was successfully lifted into place. This task marks a significant breakthrough in the installation of large-scale equipment for the project, laying a solid foundation for subsequent construction work. It is reported that to ensure safe lifting, the project team at the chemical machinery and equipment manufacturing plant carefully developed a specialized construction plan and strictly implemented safety technical instructions. The main lifting device is an XGC88000 4,000-ton crawler crane, while the auxiliary lifting device is a 600-ton crawler crane. These two heavy-duty machines work together in coordination to ensure that the C-2101 equipment is placed precisely on its designated base, setting a new record for the precision of lifting ultra-large equipment in this area. In this project, thanks to its world-leading lifting capabilities and intelligent control systems, the project team ensured seamless and efficient progression through all stages, from the positioning of the core units to the assembly of auxiliary equipment. Through precise operations and effective collaboration, they achieved a \"zero-error\" safe installation, setting a new record for the precision of lifting heavy equipment and thus accelerating the timely completion of the entire Amiral project.
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Some **laws in the Middle East stipulate that construction equipment cannot be taken out of the country once it has been brought in; in other words, the contractor’s construction equipment is included in the contract price, and it becomes the property of the owner.
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test. https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test. https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Direct discharge of condensate water from gas compressors in a certain workshop (a serious safety hazard) https://bbs.hcbbs.com/thread-5706461-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))