Thread Content
The 5# turbine of the Alxa natural soda project was successfully started up and connected to the grid on the first attempt. From November 20th to 21st, the 5# turbine of the cogeneration unit in the second phase of the Inner Mongolia Boyuan Alxa natural soda project was successfully started up and began generating electricity right away. This 5# turbine is a high-temperature, high-pressure single-cylinder turbine with adjustable extraction steam and backpressure; its nameplate power is 100 MW, the rated speed is 3000 r/min, and its maximum continuous power output can reach 110 MW. The accompanying 5# generator has a rated voltage of 10.5 KV, and it uses a self-excitation static thyristor excitation system; all its technical parameters are well-suited to the production requirements of the project.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Chemical Safety Documents】Recommended article: Interpretation of the \"Criteria for Identifying Major Accident Hazards in Industrial and Trade Enterprises\" https://bbs.hcbbs.com/thread-5706517-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical Safety Documents】Recommended article: Interpretation of the \"Criteria for Identifying Major Accident Hazards in Industrial and Trade Enterprises\" https://bbs.hcbbs.com/thread-5706517-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s First High-Pressure Underground Hydrogen Storage Well and Refueling Station Built in Chongqing 2851-2025 https://bbs.hcbbs.com/thread-5706583-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot-scale biomass gasification project carried out by Donghua Company in China’s chemical engineering sector began operations in 2025, producing syngas. https://bbs.hcbbs.com/thread-5706633-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating electricity from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 660-megawatt ultra-supercritical circulating fluidized bed boiler was approved for use, 2856–2025 https://bbs.hcbbs.com/thread-5706795-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))