HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hunan Tianfu New Material Industry Base Construction Project with a total investment of 250 million yuan

2025-11-26View Original

Thread Content

On January 25, the Administrative Approval and Service Bureau of Xiangjiang New Area issued a public notice regarding the proposed approval of the environmental impact assessment document for the Hunan Tianfu New Materials Industry Base construction project. The relevant information regarding the project is as follows: Project name: Hunan Tianfu New Material Industry Base Construction Project ; Construction unit: Hunan Tianfu New Materials Co., Ltd ; Construction location: Southwest corner of the intersection of Changxing Road and Sanan Road, Xiangjiang New Area, Hunan ; Investment amount: 250 million yuan ; Construction content and scale: The project covers an area of 33,338.67㎡, with a building area of 45,752.27㎡. Within this site, new facilities will be built, including Workshop No. 1 (R&D center), Workshop No. 2, Workshop No. 3 for logistics purposes, as well as related supporting facilities. The main activities will involve the synthesis of key materials such as perfluoroether rubber and the research and development of optical coating materials. Regarding Hunan Tianfu New Material Co., Ltd.: Hunan Tianfu New Material Co., Ltd. was established on July 6, 2017, and is located in Yuelu District, Changsha. It is a limited liability company (invested in or controlled by natural persons) that focuses on the research and development of high-end optical functional film materials, and operates in the manufacturing sector of chemical raw materials and chemicals.
Reply #22025-11-26
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
Reply #32025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-11-27
【Ten Years of Rapid Development in Chemical Processing Equipment】The period from 2025 to 2035 opens up new paths for the green and low-carbon development of the steel industry. China’s first project for 100% conversion of coke oven gas has been implemented in Lingyuan, Liaoning https://bbs.hcbbs.com/thread-5706563-1-1.html (Source: HCBBS Chemical Forum)
Reply #52025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s First High-Pressure Underground Hydrogen Storage Well Hydrogen Refueling Station Built in Chongqing 2851-2025 https://bbs.hcbbs.com/thread-5706583-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62025-11-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s First High-Pressure Underground Hydrogen Storage Well Hydrogen Refueling Station Built in Chongqing 2851-2025 https://bbs.hcbbs.com/thread-5706583-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot-scale biomass gasification project developed by Donghua Company in China’s chemical engineering sector began operations in 2025, producing syngas. https://bbs.hcbbs.com/thread-5706633-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating electricity from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-11-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 660-megawatt ultra-supercritical circulating fluidized bed boiler was approved for use, 2856–2025 https://bbs.hcbbs.com/thread-5706795-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #102025-11-29
【HaiChuan Chemical Construction Technology】The ultimate solution to extend the lifespan of instrument pipelines in winter – starting with electric heat tracing https://bbs.hcbbs.com/thread-5706825-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #112025-11-30
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.