[Haichuan Overseas Engineering] Successful lifting of Module 1C for the No. 1 waste heat boiler in the Kassim II project in Saudi Arabia

2025-11-28View Original

Thread Content

On November 26, the 1C module of Boiler No. 1 for waste heat recovery, part of the Kaisum II installation project in Saudi Arabia and constructed by Zhejiang Hengdian Construction Co., Ltd., was successfully lifted and placed in position, marking the official start of the installation work for Boiler No. 1. It is reported that the waste heat boiler modules for this project were designed and manufactured by NE Company; a total of 3 such boilers are installed, with each boiler comprising 15 modules. The lifting is carried out using 700-ton crawler cranes, while the cranes used for unloading and lifting the modules are 500-ton crawler cranes. Once the module has been turned 90° vertically, the 700-ton crawler crane slowly lifts it. At this point, the turning frame requires the assistance of a 260-ton crawler crane along with a 500-ton crawler crane to prevent it from tilting; once the module passes above the top of the turning frame, it is then slowly placed on the ground. The modular lifting of the waste heat boiler is the most important and critical step in its installation, requiring high precision and safety standards for the lifting operations. Furthermore, to ensure smooth lifting, the project management team carried out thorough planning and technical briefings. During the lifting process, the operators in various positions worked together in coordination; the lifting equipment operated smoothly, and the entire process was safe, orderly, and efficient.
Reply #22025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating power using excess pressure from high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-11-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating power using excess pressure from high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-11-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating power using excess pressure from high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-11-29
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-11-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】SINOPEC’s Research Institute of Petrochemical Technology’s high-efficiency catalytic cracking (RTC) technology was tested and validated at Zhenhai Refining & Chemical Complex from 2023 to 2025. https://bbs.hcbbs.com/thread-5705591-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-11-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #82025-11-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2019 to 2025, China developed the world’s first 600MW class ultra-supercritical secondary reheating boiler that utilizes by-produced gas as fuel. https://bbs.hcbbs.com/thread-5705120-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #92025-11-30
【Ten Years of Rapid Development in Chemical Processing Equipment】The largest domestic project of its kind for continuous polymerization on a scale of 5,000 tons per batch of para-aramid fibers was successfully commissioned between 2021 and 2025. https://bbs.hcbbs.com/thread-5704579-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.