Thread Content
On November 27, the high-performance special plastics project of Jinfat Technology in Zhuhai, constructed by China National Chemical Ninth Construction Corporation, achieved successful power supply for the first time. This provided a reliable guarantee for the proper operation of the core equipment later on, laying a solid foundation for the overall progress of the project. To successfully achieve the project objectives, the project team carried out thorough preparation and meticulous planning in the early stages, establishing a working framework based on \"planning first, standards as guidelines, and collaborative efforts.\" In the face of various challenges such as a tight project schedule, limited working space, and concurrent construction by multiple specialties, the project team carefully planned the tasks. With close cooperation from all parties, they successfully completed the work of assembling high-voltage cabinets, laying cables, making connections, manufacturing cable terminals, carrying out installations, and conducting tests and inspections. They also performed thorough checks and testing on the protection, control, and signaling circuits of the power supply equipment to ensure that every piece of equipment was in optimal condition. At the same time, the project team has also developed detailed emergency plans to address various potential security incidents. During the power-on operation, the project team followed the established plan strictly, taking great care at every step. After several hours of intense work, the substation equipment was successfully started up, with all parameter values meeting the design requirements; as a result, a successful power-up was achieved with \"zero errors and zero risks\".
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating power from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-scale methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2833-2025 – Amazing! Nanjing Engineering’s new construction technology for spherical storage tanks based on full-position automatic welding has been put into large-scale use at Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】SINOPEC’s Research Institute of Petrochemical Technology’s high-efficiency catalytic cracking (RTC) technology was tested and validated at Zhenhai Refining & Chemical Complex from 2023 to 2025. https://bbs.hcbbs.com/thread-5705591-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2019 to 2025, China developed the world’s first 600MW class ultra-supercritical secondary reheating boiler that utilizes by-product gas as fuel. https://bbs.hcbbs.com/thread-5705120-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The largest domestic project of its kind for continuous polymerization on a scale of 5,000 tons per batch of para-aramid fibers was successfully put into operation between 2021 and 2025. https://bbs.hcbbs.com/thread-5704579-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))