Thread Content
On December 4, the Guoneng e-Zhao website issued a tender announcement for the project of preparing a pre-feasibility study report for the first phase of the Guohua Investment Guohua (Ningxia) New Energy Co., Ltd. Guoneng “Hydrogen in Liangshan” Green Hydrogen-based Products Demonstration Base. According to the announcement, this project plans to be developed in Liangshan Prefecture, Sichuan Province, as a demonstration project covering an entire industrial chain that includes \"integrated water, wind, and solar power generation\"; \"green hydrogen production, storage, transportation, distribution, refueling, and equipment manufacturing\"; \"green ammonia production\"; and \"integrated oil, hydrogen, and electricity energy stations\". The main construction components of the project include: the chemical processing section – the construction of a green ammonia plant with an annual production capacity of 100,000 tons, as well as a hydrogen production system that uses green electricity for electrolysis, with a capacity of 35,000 standard cubic meters per hour (with provisions for hydrogen metallurgy and modular connection options). Additional facilities such as air separation systems for nitrogen production, ammonia cracking systems for hydrogen production, and systems for storing and transporting hydrogen and ammonia will also be installed ; Build an integrated oil-hydrogen-electric energy station in Dechang County or Xichang City ; New energy section: Construct 250MW wind power plants for hydrogen production and 250MW photovoltaic plants for hydrogen production in the counties and cities surrounding the proposed hydrogen and ammonia factory, along with corresponding direct transmission lines for green electricity to serve as the power source for hydrogen production in this project. Additionally, 650MW wind power plants connected to the grid and 650MW photovoltaic plants connected to the grid will be built within the Liangshan Prefecture.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the flare angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Ansteel pursued the project aimed at achieving localization of steel catenary risers and related components used in oil and gas exploration; the first batch of welded steel catenary riser products produced as part of this project were launched globally. https://bbs.hcbbs.com/thread-5707125-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first commercial project for producing hydrogen via water photolysis, 2884-2025, has been completed and put into operation in Panzhihua City. https://bbs.hcbbs.com/thread-5707404-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company managed to achieve the domestic production of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))