Thread Content
According to Coalification News, in compliance with the \"Law of the People’s Republic of China on Bidding\" and relevant laws and regulations, and adhering to the principles of openness, fairness, impartiality, and good faith, the Bidding Department of Inner Mongolia Guangna Coal Industry (Group) Co., Ltd. is conducting a public domestic bidding process for the maintenance of pressure pipelines related to the 5 million tons per year coal coking integrated production project of Inner Mongolia Guangju New Materials Co., Ltd. Enterprises in this industry are invited to submit bids. I. Basic Information: 1. Tenderer: Inner Mongolia Guangna Coal Industry (Group) Co., Ltd ; 2. Location of construction: Low-carbon Industry Park, Hainan District, Wuhai City, Inner Mongolia ; 3. Construction scale: This project is now in operation, with a coal coking capacity of 5 million tons per year, a co-produced methanol capacity of 600,000 tons per year, and a liquid ammonia capacity of 200,000 tons per year. 4. If bidders wish to conduct an on-site inspection, please contact the technical specialist: Xue Haibing; contact number: 13848358052. 5. Subject matter: 1) The volume of work is estimated at 176 pipes, with a total of 252 defects. The additional work volume generated during the December inspection shall be priced according to the rates of this tender. 2) This project adopts a fixed comprehensive unit price covering all costs, with settlement based on the actual cost at a fixed price per inch. II. Qualification requirements for bidders: 1. Bidders must have good banking credit and commercial reputation, not be in a state of being ordered to suspend operations or going bankrupt, and their assets must not be restructured, taken over, or frozen ; 2. Bidders must provide evidence of relevant performance from the past 2–3 years, ensuring that no major safety incidents occurred during the construction of such projects, that the systems operated well after completion, and that there were no significant quality issues or that effective corrective measures have been taken. 3. Possess a \"Special Equipment Production License\" issued by the market supervision authorities, whose scope of authorization includes the installation (or modification, maintenance) of pressure pipelines; the license level must be appropriate or higher, and it must be valid. III. Method of bidding registration: 1. Registration period: The registration period for this tender is from December 4, 2025, to December 10, 2025; applications from bidding parties submitted after this date will not be accepted. In case of special circumstances, this department will terminate the registration process in advance; please be informed ; 2. Registration details: 1) Bid application letter (this letter must include the full name of the bidder’s company, the contact person and contact information during the bidding period (at least phone number, email address, WeChat ID), the company’s address, the intention to bid, the type of bidder (manufacturer/agent), the bank where the account is held along with the bank account number, the receiving account details, the type of invoice, and the tax identification number). Note: A copyable version of this application letter must be sent ; 2) Power of attorney from the legal representative (must be stamped with the official seal) ; 3) Copy of the enterprise business license (must be stamped with the official seal) ; 4) Bidder’s corporate qualifications and relevant documents ; 5) Bidder’s performance reports for related industries in recent years. The above materials can be scanned into electronic documents and sent to the registration email; materials submitted after the deadline will not be accepted. Bidders who provide false information will have their bidding eligibility revoked once it is discovered. 3. Registration method: 1) On-site registration: Guangna Building, Binhe District, Wuhai City, Inner Mongolia. 2) Online registration: Send the registration-related materials to the email address 15147429181@163.com; no other methods are accepted. Contact person: Han Zilong; Contact number: 15147429181. IV. Time and place for issuing the tender documents: After the prequalification process is completed, the tenderer will inform the bidders whether they have passed the prequalification. The tender documents will be issued to those who have passed the prequalification, and the specific time and place will be notified separately. V. Time and place of bid opening: The time for bid opening will be notified separately. Bid opening location: Conference Center, 6th Floor, Guangna Building, Binhe District, Wuhai City, Inner Mongolia.
Is it really necessary to invest 13.268 billion yuan in pipeline maintenance projects?
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company successfully achieved the domestic substitution of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Hchbbs Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via synthetic gas biofermentation at a capacity of 50,000 tons per year successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】100 Days of Safe Operation for CNPC Gansu Company’s Natural Gas Hydration Demonstration Project: A Major Breakthrough Towards Commercial Operation https://bbs.hcbbs.com/thread-5706934-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))