[Haichuan Overseas Engineering] Successful completion of turbine casing installation for Unit 1 of the 2×25MW coal-fired power generation project in Indonesia

2025-12-13View Original

Thread Content

The cylinder assembly for the turbine of Unit 1 in Indonesia’s 2×25MW gas-fired power generation project was successfully completed on December 8. As a crucial step in the installation process, cylinder assembly involves strict technical standards, high precision requirements, and significant construction challenges; it directly affects the quality of unit installation as well as its subsequent stable operation. To ensure the smooth progress of the turbine casing assembly work for Unit 1, the project team strictly controlled three key stages throughout the process: plan review, on-site inspection, and joint approval. They optimized the construction plan to the fullest extent, carried out all preparatory tasks one by one, thoroughly cleaned each component, and precisely followed the requirements for assembly procedures. They successfully completed the lifting and installation of key components such as the lower partition, rotor, upper partition, and upper cylinder, ultimately achieving a successful completion of the turbine casing assembly work for Unit 1.
Reply #22025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】Major breakthrough achieved in 2898-2025: «Seamless alloy steel pipes for high-temperature quenching heat exchangers» https://bbs.hcbbs.com/thread-5708171-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】Major breakthrough achieved in 2898-2025: «Seamless alloy steel pipes for high-temperature quenching heat exchangers» https://bbs.hcbbs.com/thread-5708171-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-14
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Damaged Insulation Layers of Pipelines https://bbs.hcbbs.com/thread-5708255-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that makes use of pressure energy was officially put into operation in Shaoxing, Zhejiang, from 2874 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCBBS Chemical Forum)
Reply #82025-12-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2900 to 2025: Beijing Aerospace Power Research Institute developed China’s first polyolefin crushing and feeding machine, which has been in operation at a polyolefin plant in Tianjin for over 30 days. https://bbs.hcbbs.com/thread-5708326-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-15
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102025-12-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.