Thread Content
On December 12, the Jinfeng Xingan League Green Hydrogen to Green Methanol (Phase II) project was approved for implementation. The project owner is Jinfeng Green Energy Chemicals (Xingan League) Co., Ltd. The construction site is located in Xingan League – Ulanhot City – Xingan League Economic and Technological Development Zone. The total investment amount is 1,200 million yuan, of which 240 million yuan comes from own funds, 960 million yuan will be obtained through bank loans, and there is no investment from other sources. The planned period for construction is from December 2025 to December 2027. The scale and scope of the project include the construction of key production facilities such as biomass gasification and methanol synthesis and distillation units, along with related supporting infrastructure; the project aims to produce 600,000 tons of green methanol per year.
[Haichuan Chemical Technology Documentation] How are the design temperature and design pressure of equipment and pipelines determined? https://bbs.hcbbs.com/thread-5708207-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Damaged Insulation Layers of Pipelines https://bbs.hcbbs.com/thread-5708255-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for agglomeration using coal gangue on a scale of tens of millions of tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that utilizes pressure energy was officially put into use in Shaoxing, Zhejiang, from 2024 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】2881-2025: China’s company undertakes the general contracting for the world’s largest MTBE plant, which began operations ahead of schedule https://bbs.hcbbs.com/thread-5707365-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))