Sinopec Hunan Petrochemical’s projects approved (planned to be built), under construction (about to go into operation), and already in operation for the second half of 2025

2025-12-15View Original

Thread Content

Sinopec Hunan Petrochemical’s projects that have been approved for construction in the second half of 2025, are under construction (on the verge of going into operation), or are already in operation: Approved (planned for construction) project – Hunan Petrochemical and Fosun Plastics’ polyamide-nylon film project: This is a joint venture project between Fosun Plastics and Hunan Petrochemical; on September 26, Fosun Plastics announced that the two parties would establish Hunan Guangxin Polymer New Materials Co., Ltd. to handle this project. The project is planned to incur an investment of 3.469 billion yuan for the construction of production lines for polyamide chips and nylon films; the construction period will be 38 months, with Hunan Petrochemical holding a 40% stake in it. - Hunan Petrochemical’s new 50,000 tons per year oil slurry hydrogenation and purification unit project: According to a progress report dated December 9, the civil engineering and piping work related to this project have entered the construction phase. Meanwhile, all preliminary preparations such as the special construction plan for the hydrogenation facility, as well as the submission of applications for personnel and construction vehicles, have been completed. It is planned to finalize the signing of the approval documents this week, with settlement to be completed by December 20. On December 5, Yunxi District in Yueyang announced the approval for the project’s engineering planning permit. Ongoing project – Hunan Petrochemical’s 1 million tons per year ethylene refining and petrochemical integration project along with related refinery upgrades: Construction began on January 3, 2024. To date, the land for the main construction area has been handed over, the site has been leveled, and most of the dynamic compaction work has been completed. The project is now in the stage of equipment procurement and preparation for the main construction works, with commercial operation expected to begin in 2027. -Hunan Petrochemical’s 170,000 tons per year high-performance epoxy resin production facility project: The project progress is well-defined; equipment installation began in March, and from August to October there was a peak period for civil work completion and equipment installation, with overall progress exceeding 60%. Throughout the construction process, special control measures were implemented, as well as a duty shift system, in order to strictly manage various safety risks such as those related to lifting operations and concurrent tasks. Commissioning of the unit is expected to take place by the end of 2025. The project is currently in the final stage of equipment installation; if things proceed smoothly, it is highly likely that the relevant commissioning tests can be completed by this scheduled date. The project utilizes technology independently developed by Hunan Petrochemical, and upon completion it will reduce reliance on imported related products and enhance the competitiveness of the enterprise. - Hunan Petrochemical Biomass Gasification Flexible Platform Construction Project: Foundation work commenced on July 1, utilizing the pressurized circulating fluidized bed (SFBG) and gas-fluidized bed (SEBG) biomass gasification technologies independently developed by Sinopec. As of December 7, the overall progress of the project is 85%; the main gasification structure has been completed, and the heavy lifting operations have been successfully finished. The mechanical installation is expected to be completed by December 30. - Hunan Petrochemical’s project for the relocation, upgrading, and transformation of its production facility capable of producing 600,000 tons of caprolactam per year – specifically, the distributed photovoltaic canopy project in the new area: On November 24th, workers at the construction site were installing photovoltaic panels. The photovoltaic component of this 1.16-megawatt distributed photovoltaic project in the new caprolactam production area has been completed; the photovoltaic canopy is expected to be finished and connected to the power grid by the end of 2025. - Hunan Petrochemical Smart Logistics Project: Hunan Petrochemical has carried out automated upgrades to the packaging line in the logistics system of Area 2; as of early December 2025, the overall progress of the project is 73%. Among them, the packaging line for SBC products in the rubber division and the renovation of the automated warehouse have entered the final stage; the main equipment in the packaging plant has been installed, while work on installing and testing the automated warehouse is in full swing. Projects in operation – Shanghai Jinshan Baling New Materials Company’s project for producing 250,000 tons of SBC per year: On November 12, 2025, this project was fully completed and put into operation, with a successful first startup; all the products produced passed the quality tests. Thus, the annual production capacity of SBC elastomers at Hunan Petrochemical’s headquarters and its two joint ventures amounts to 800,000 tons, making it the world’s largest manufacturer and R&D provider of SBC elastomers, with a wide range of products and advanced technology.
Reply #22025-12-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-15
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for hexanitronic acid via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year hexanitronic acid facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42025-12-16
【Haichuan Equipment Guessing Game】What device is this that looks like a Katyusha? https://bbs.hcbbs.com/thread-5708487-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2900 to 2025: Beijing Aerospace Power Research Institute developed China’s first polyolefin crushing and feeding machine, which has been in operation at a polyolefin plant in Tianjin for over 30 days. https://bbs.hcbbs.com/thread-5708326-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-17
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82025-12-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】Full capacity operation achieved for China’s most remote offshore wind power projects by 2025 https://bbs.hcbbs.com/thread-5708401-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-20
【Ten Years of Rapid Development in Chemical Processing Equipment】World’s largest high-end bimodal HDPE dryer with capacity up to 2904–2025 has been installed https://bbs.hcbbs.com/thread-5708513-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112025-12-20
【Ten Years of Rapid Development in Chemical Processing Equipment】World’s largest high-end bimodal HDPE dryer with capacity up to 2904–2025 has been installed https://bbs.hcbbs.com/thread-5708513-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.