HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Haichuan Modularization] Precise lifting of skid-mounted interdisciplinary integrated units completed for Lanzhou’s clean and intelligent heat source project

2025-12-24View Original

Thread Content

Recently, the precise lifting of the skid-mounted, interdisciplinary integrated unit for the Hehai New Energy Lanzhou Clean and Smart Heat Source project carried out by the Guangdong branch of China National Chemical Engineering Corporation’s 13th Construction Company was completed, marking a transition in this project’s construction approach from civil engineering to equipment integration, and bringing modular intelligence to the “Lanzhou Blue” community heat supply project. The skid-mounted unit is 16.5 meters long and 3 meters high, integrating six core heating systems. Over a period of 45 hours, the work on site involved welding two weldable pipes for flue gas waste heat recovery, two seamless pipes for unit extraction steam, as well as four pipes of medium and small diameter. At the same time, frame welding was carried out, and 66-meter-long galvanized cable trays were pre-assembled; compatibility with surrounding equipment was verified through 3D scanning, enabling a construction approach of \"prefabrication on the ground and installation in the air\". During the lifting process, the 100-ton truck crane used precise operations over a period of 5 hours to successfully place the 15-ton prefabricated cross-disciplinary integrated unit, which was prepared on the site ground, at axis 0-1 of the deaeration coal bin room. To overcome the challenge of having a work area of only 50 square meters, located right next to the boiler frame and the heat pump room, the project team employed a \"ground-to-air\" transfer method, enabling a 90-degree adjustment of the unit in the air within 17 minutes, with a positioning error of ≤30 millimeters. This approach reduced on-site operations by 60% compared to traditional methods of lifting individual components, saved 40% of the construction time, and effectively minimized the risks associated with construction in winter conditions.
Reply #22025-12-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025 – Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025 – Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-12-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #102025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.