On November 30, 2023, the plant-side system of Hubei Yingcheng’s 300-megawatt compressed air energy storage demonstration project – China’s first non-reburning compressed air energy storage power station – was successfully powered up for the first time. This marked the full entry of the project into the commissioning phase, laying a solid foundation for the complete startup of the unit and its connection to the power grid. It also indicates that this project will become China’s first operational 300-megawatt non-reburning compressed air energy storage power station. In recent years, the installed capacity for new energy power generation has expanded rapidly, with wind and solar power accounting for an increasing share. However, due to the volatility, intermittency, and randomness of these new energy sources, they pose challenges to the stable operation of power systems. To ensure the stable functioning of power grids and enhance the capacity for storing electrical energy, large-scale energy storage has become an essential solution. In terms of energy storage options, compressed air energy storage is currently the most mature physical energy storage technology aside from pumped hydro storage, and it is also one of the hot topics in the industrialization of large-scale energy storage technologies. “Compressed air energy storage involves using electricity from off-peak times to compress air and store it in salt caves; during peak demand, this compressed air is released to generate power, thereby improving the reliability of the power grid. The entire process enables the storage and delivery of electrical energy through the compression and release of air. ”Xing Taigao, deputy general manager of Hubei Chuyun Energy Storage Technology Co., Ltd., said. Compared to other energy storage methods, it offers advantages such as being environmentally friendly and having a short construction period; it can also provide services like peak power regulation, frequency control, phase regulation, spinning reserve, and emergency response. “We use abandoned salt caverns as gas storage facilities. Thanks to the dense structure of salt rock and its self-repairing properties, it is possible to keep the interior of the salt caverns within the designed pressure range, ensuring that neither gas leaks nor the caverns collapse. ”Xing Taigao said. All compressed air energy storage plants that are in operation abroad are equipped with a afterburning system that burns large amounts of fossil fuels to assist in power generation; the heat generated during the compression of air is not recovered. In contrast, the Yecheng compressed air energy storage project adopts a non-afterburning, medium-temperature adiabatic compression technology to recover the heat produced during air compression and use it for power generation, thereby achieving combustion-free operation, zero carbon emissions, high safety levels, and environmental sustainability. Wang Jun, a responsible official from State Grid Hubei Comprehensive Energy Company, said that as part of the first batch of pilot projects for new power systems carried out by State Grid Hubei Electric Power, this project provides strong support for the utilization of new energy sources in Hubei Province as well as for ensuring the stability of the power grid supply. Once completed, the project will significantly alleviate the issue of insufficient peak-shaving capacity in Hubei, promote the utilization of new energy in the surrounding areas, enhance the power supply capacity of the Xiaogan region, and provide backup as well as dynamic reactive power support for the power grid. As the technical support unit for the project, State Grid Hubei Electric Power Research Institute was involved in tasks such as the preliminary feasibility study, initial design, preparation of technical specifications for key equipment, supervision of the manufacturing process of these devices, and conduct of special electrical tests, thereby providing solid support for the smooth implementation of the power transfer operations. It is reported that this project was jointly funded by State Grid Hubei Comprehensive Energy Service Co., Ltd. and China Energy Engineering Group Digital Technology Co., Ltd. It was included by the **Energy Administration in the third batch of lists of major technical equipment (projects) in the energy sector. Once completed, it will achieve world-leading levels in terms of unit power, energy storage capacity, and conversion efficiency in the field of non-combustion compressed air energy storage. The project is scheduled to be completed and put into operation in June next year. Once completed, it is expected to generate 500 million kWh of electricity per year, sufficient to meet the power needs of a medium-sized city.
Reply #22023-12-09
Haha, that’s great, really good indeed, uh huh ah ah
Reply #32023-12-10
60 pieces of field experience summarized by instrument engineers 100 |1 Elevator goes straight to the designated floor. Floor 1: Huanghong VIP member. VIP member | View only content from this author. Rewards for replies. Last visited IP: Shandong Province. Title: None. 1. Never use a multi-core cable as both a signal cable and a power cable! 2. When maintaining instruments and equipment in oxygen pipelines, avoid oil contamination; oil-sensitive transmitters and pressure gauges must not be installed together with ordinary gauges. 3. When disconnecting wires from the instrument for repair, be sure to wrap the wire ends properly to prevent short circuits! 4. Cables should not have intermediate joints. 5. Point shielding grounding is generally carried out on the control room side. 6. The protective hose must be positioned below the instrument inlet to prevent water from entering the instruments. 7. The open-air instruments should be equipped with instrument protection boxes or wrapped in nylon plastic bags. 8. When cables are laid in cable trays, intrinsically safe cables, power cables, and signal cables should be separated using partitions. 9. When making connections, compensation wires should not be used with terminal lugs to prevent contact between two different conductors, which could cause measurement errors. 10. During production, if there are issues that need to be addressed with the instruments, both indoors and outdoors, it is necessary to follow the established procedures or protocols. The operators must be informed, and in some cases, a written signature is also required. 11. In areas with lightning protection, where field instruments are connected to a safety barrier via surge protectors and then to control systems such as DCS and SIS, in order to avoid unnecessary wiring in additional cabinets, the surge protectors located in the field cabinet room should be installed on the same side of the cabinet as the safety barriers for the corresponding circuits. 12. The control room must have measures in place to prevent small animals, as rats urinating on ESD cards can cause the entire system to stop operating, resulting in significant losses. 13. Single-unit testing must be completed before installing the instruments, and circuit testing must be finished after installation before conducting integrated testing. 14. When the device is in operation, process technicians must be present for the maintenance of the instruments. Keep this in mind: if a problem arises, it’s not a minor matter. 15. When performing on-site maintenance of instruments, it is essential to contact the process engineers to understand the current status of the process. When removing instruments that are connected to power sources, be sure to turn off the power first, and then use a multimeter to confirm that the power has indeed been turned off – after all, your life is your own. 16. When designing flow meters, it is essential to select the appropriate type of meter based on the medium being measured, as well as temperature and pressure factors, and to implement proper flow compensation. Attention should be paid to the various special requirements of flow meters during installation. 17. When installing the instrument panels in the control room, to prevent rainwater from entering the control room, it is necessary to consider upward and downward bends as well as ensure proper sealing. 18. When instrument air is introduced from the main pipeline, the valve must be located directly above the center of the pipeline, ideally at a 90-degree angle above it, in order to prevent debris in the air stream from entering the instrument valve. 19. The shielding layer shall not be grounded at both ends ; The openings of outdoor cable protection pipes should have rainproof measures ; In explosion-proof environments, pay attention to the sealing of pipe openings. 20. Alarm instruments and audio equipment must be properly maintained and in good working condition; otherwise, in the event of a process accident, the personnel in charge of instrumentation will face serious consequences, as the operators fail to detect the issue due to faulty alarms. 21. In situations involving ammonia, copper and copper alloys are prohibited ; The DCS system should be powered by a dual-power supply design! 22. For thermistor temperature measurement, a two-wire system cannot be used for long-distance transmission. 23. The insulation resistance of the cable should be greater than 5 megohms ; The bending radius of cables should generally be more than 10 times the diameter of the cable, while for optical fibers it should be 15 times ; When instrument cables are laid parallel to electrical cables, a certain distance should be maintained between them (greater than 0.8 meters), and the distance from such cables to equipment and pipes should be more than 150 millimeters. 24. For the hydraulic testing of instrument pipelines, when testing austenitic stainless steel pipelines, the chloride content in water must not exceed 25 PPM. The working ground resistance of the instruments should be less than 1 ohm, while the resistance of other grounds should be less than 4 ohms. 25. The protection of instruments should be done using fire-resistant cloth, namely “asbestos cloth”. Plastic bags should not be used. 26. The instruments used in the hydrogen unit must meet both the explosion-proof rating requirements and the protection rating requirements; neither can be omitted. Intrinsic safety signals (cables) and flameproof signals (cables) cannot be fed into the same field intermediate junction box. 27. The insulation resistance of the cable should be greater than 5 megohms ; The bending radius of cables should generally be more than 10 times the diameter of the cable, while for optical fibers it should be 15 times ; When instrument cables are laid parallel to electrical cables, a certain distance should be maintained between them (greater than 0.8 meters), and the distance from such cables to equipment and pipes should be more than 150 millimeters. 28. For the hydraulic testing of instrument pipelines, when testing austenitic stainless steel pipelines, the chloride content in water must not exceed 25 PPM. The working ground resistance of the instruments should be less than 1 ohm, while the resistance of other grounds should be less than 4 ohms. 29. The instruments used in the hydrogen unit must meet both the explosion-proof rating requirements and the protection rating requirements; neither can be omitted. Intrinsic safety signals (cables) and flameproof signals (cables) cannot be fed into the same field intermediate junction box. 30. When designing the FF bus, terminators (series-connected resistors and capacitors) must be installed at the terminals of the power regulator and the field bus junction box. 31. The solenoid valves used for interlocking should be fail-safe type, remaining powered under normal conditions and de-energized during interlocking. 32. When designing and installing instruments, if the pipeline for the temperature instrument has a diameter of less than DN80, a thermometer expansion tube should be used to increase the pipeline diameter to over 80. 33. The flow measurement element is not included in the plant’s hydrostatic testing. 34. When measuring steam flow and condensers are used for the positive and negative pressure transfer lines, the installation heights of the two condensers must be kept identical. 35. For bending the pressure guiding tubes of on-site instruments, cold bending should be used; hot bending methods such as gas welding are not permitted. 36. The occurrence of flashing must be fully considered in the design and selection of control valves, the design of pipelines, and the determination of pressure distribution. When looking at control valves, the following points should be noted. (1) Increase the hardness of the material. (2) Reduce the flow velocity of the fluid. (3) Select the appropriate type and flow direction of control valve. For example, for fluids that vaporize easily, ball valves and butterfly valves with high pressure recovery should not be used; instead, single-seat valves with low pressure recovery can be chosen. Measures to eliminate and reduce what actually occurs: (1) Control the pressure drop to prevent cavitation. For example, a multi-stage pressure reduction method is employed to divide the pressure drop across the control valve into several stages. (2) Reduce the impact of cavitation. A similar method to that used to prevent flashing is employed. For example, by increasing the hardness of the material or reducing the flow rate, the impact caused by cavitation can be minimized. (3) Allocate pipeline pressure reasonably to increase the downstream pressure. 38. Issues to note when laying cables and wires overhead to enter the control room: (1) Before entering the control room, provide a fixed support for the tray to prevent stress from weather changes from being applied to the equipment inside ; (2) There should be a slope of more than 1/100 before the trough plate reaches the control room, with the slope facing outward, to prevent rainwater from flowing into the control room along the trough plate ; (3) The openings in the walls leading to and from the control room must be sealed to prevent rats and insects from entering. 39. When selecting local pressure gauges, it is essential to determine the nature of the pressure source: whether it is a shock load or normal pressure. If there aren’t enough gauges available, replacing them can be a problem. The installation dimensions of the in-situ thermometer must be discussed with the process engineers; when measuring liquids that are not fully filled in the pipe, it is essential to choose the right dimensions ; When designing, the selection of materials for high temperature and high pressure must differ from those used under normal temperature and pressure conditions. Never disassemble equipment while it is still powered on; carry a voltage tester with you to avoid the risk of electric shock. 40. Do not disassemble equipment while it is still powered on; carry a voltage tester with you to avoid the risk of electric shock. 41. DCS must implement proper anti-static measures to prevent accidents caused by static electricity. 42. To service the interlock equipment, a forced command from the DCS is mandatory before any action can be taken. 43. The solenoid coil must not be removed while powered, otherwise the coil will be damaged. 44. When rotors and wheel flowmeters are installed vertically, it is essential to ensure that the fluid flows from bottom to top. 45. After installing a new control valve, the air supply pipeline should be vented for a while before being connected to the valve positioner, to prevent oil from entering and causing damage to the positioner. 46. Copper is also prohibited in instruments used for acetylene gas; therefore, in applications involving acetylene gas, in addition to meeting the requirements regarding explosion protection ratings, it is necessary to pay attention to the fact that some devices may have a label stating “Not suitable for acetylene gas”. 47. Current signals between DCS and electrical systems. Since the electrical signals that are sent over are usually active, it is best to use an isolator for isolation. On one hand, this prevents the instrument’s I/O cards from being connected to the electrical circuit; on the other hand, without an isolator, it may be impossible to achieve proper synchronization between the two systems. 48. Provide steam tracing for the instrument piping; it is advisable to use tracing pipes with an outer diameter of 12 inches or more, as otherwise, if the pipeline length is large, it is easy for the steam to not be hot enough, resulting in poor tracing efficiency. 49. To correct a common error in design: some people install safety barriers regardless of the type of anti-riot system in use. In fact, safety barriers are used in intrinsically safe explosion-proof systems. Intrinsic safety explosion-proof system: (1) The field instruments must be intrinsic safety type instruments ; (2) A safety barrier must be present on the control room side. (3) The cable in the middle must be an intrinsically safe signal cable. 50. For increased-safety instruments and flameproof instruments, signal isolation can be achieved using isolators if necessary. 51. Attention must be paid to grounding issues with Zener-type safety barriers. 52. In fact, instruments and the manufacturing process are inseparable; when performing online maintenance on instruments, it is essential to minimize any disruption to the manufacturing process. 53. Selection of flow meters: When the conductivity of the process fluid being measured is low, electromagnetic flow meters cannot be used ; When high-level plant-level measurement is required, a mass flow meter should be used. 54. When measuring the pressure of a medium, a condenser or desiccant must be used when the temperature of the medium being measured is above 60 degrees. 55. After installing the pneumatic control valve, be sure to pay close attention not to get the operating settings for air-open and air-close types wrong in the DCS. 56. If the reading of the temperature instrument system suddenly reaches the maximum or minimum value, it is generally due to a fault in the instrument system. Because the temperature instrument system has a large measurement lag, no sudden changes occur. At this time, the causes of failure are usually broken thermocouples, thermal resistors, compensation wires, or a malfunctioning transmitter amplifier. 57. Be sure to label the wire numbers properly when wiring instruments! I made such a silly mistake while working before; it was very troublesome to fix. If a component is installed at a bend in the pipe or at an inclined angle, it should be installed against the flow direction. 58. If there are both pressure primary points and temperature primary points on the same pipeline, the pressure primary point should be located on the upstream side of the temperature primary point. 59. The rotameter must be installed vertically on the pipeline, and the flow direction of the medium must be from bottom to top. 60. Straight pipes require 5DN on the upstream side and 3DN on the downstream side (DN is the pipe diameter).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.