HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The EMC/DEC equipment and auxiliary facilities for Jingmen Yuanhan electrolyte precursor project were successfully commissioned

2025-12-26View Original

Thread Content

On December 19, the EMC/DEC units as well as the auxiliary facilities for the electrolyte precursor project at Jingmen Yuanhan, operated by China National Chemical Engineering Donghua Company, were successfully handed over. This marks the completion of delivery of all units for this project, and it is now about to enter the phase of joint commissioning. The EMC/DEC equipment for the project began construction on January 8, 2025, and was completed efficiently in less than a year. Starting construction on March 14, 2025, the auxiliary engineering project completed a series of key milestones in just 9 months: the establishment of power supply and distribution at the main and sub-transformers, the integration of all signals into the control system, the completion of individual unit tests, and the full operationalization of the entire process chain – demonstrating excellent project management and execution efficiency. Next, the project team will continue to adhere to the principles of efficient collaboration and scientific organization, making every effort to ensure the successful completion of subsequent joint commissioning and startup operations, thereby laying a solid foundation for the early operation and full functionality of the project.
Reply #22025-12-26
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #32025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #42025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-27
【Haichuan Equipment Guessing Game】Does anyone know it? ? What kind of storage tank is this? Why does it have such a structure inside? https://bbs.hcbbs.com/thread-5709647-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-28
【Ten Years of Rapid Development in Chemical Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #82025-12-28
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2025, Shaanxi Gas Turbine Power, in collaboration with Ningxia Runxia, carried out China’s first project to convert nitric acid production units from steam-driven to electric-driven systems. https://bbs.hcbbs.com/thread-5709560-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.