The 2,134-ton propylene distillation tower for CNOOC Shell Huizhou Phase III ethylene project was hoisted into place

2025-12-26View Original

Thread Content

On December 23, the heaviest unit of the CNOOC Shell Huizhou Phase III ethylene project, the propylene distillation tower, was successfully lifted in a single attempt. The propylene distillation tower is 110 meters tall, 9.8 meters in diameter, and weighs 2,134 tons. It was successfully installed in just under 8 hours, setting a new record for the weight of a single piece of equipment lifted in this project. This achievement marks progress in the installation of large-scale equipment on the project, laying a solid foundation for the overall advancement of the construction work. It is understood that, as the \"separation hub\" of the ethylene plant, the propylene distillation tower plays a key role in improving the yield of propylene and purifying the product. Due to its “giant” scale, its project management capabilities, technical problem-solving skills, and team collaboration abilities are all put to severe strain. Faced with the severe challenge of lifting the heaviest load, the project team adopted a approach centered on advanced technology and meticulous management. A dedicated task force was established to carry out comprehensive technical evaluations and multiple rounds of plan optimization: from precise verification of the foundation’s bearing capacity and scientific selection of lifting hardware, to digital simulation of the lifting process – every technical parameter was carefully checked and tightly controlled to ensure that the lifting operation was conducted in a scientific and error-free manner. In terms of project organization, the project team focused on seamless coordination of various tasks, managing key aspects such as equipment transportation and foundation construction. This ensured efficient allocation of resources including labor, machinery, and materials, providing a solid foundation for the lifting operation. On the day of lifting, the 4,000-ton crawler crane’s main hoist and the 1,250-ton tailer crane worked in coordination. Under the unified command of the project team, the propylene distillation tower was lifted smoothly, eventually being positioned to within millimeter accuracy. It is reported that the successful installation of the propylene distillation tower this time has created favorable conditions for the subsequent installation of process pipelines and associated equipment. The experience gained from handling such heavy equipment during this lifting operation provides important technical and managerial support for the further development of the project.
Reply #22025-12-26
This level of lifting work should have been carried out by Sinopec’s construction team.
Reply #32025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-27
【Haichuan Equipment Guessing Game】Does anyone know it? ? What kind of storage tank is this? Why does it have such a structure inside? https://bbs.hcbbs.com/thread-5709647-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52025-12-28
【Ten Years of Rapid Development in Chemical Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: HCBBS Chemical Forum)
Reply #62025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2025, Shaanxi Gas Turbine Power joined forces with Ningxia Runxia to carry out China’s first project to convert nitric acid production units from steam-driven to electric-driven systems. https://bbs.hcbbs.com/thread-5709560-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
Reply #82025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Domestically developed unmanned emergency rescue equipment set released for the period 2023–2025: https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.