The construction of Dongjing Green Energy’s Wuhai project, the largest PBAT facility in China, is accelerating

2025-12-27View Original

Thread Content

Recently, the biodegradable materials production project established by Shanghai Dongjing Green Energy New Materials Co., Ltd. (hereinafter referred to as “Dongjing Green Energy”) in Wuhai City, Inner Mongolia, has seen a series of key developments. The overall planning for the industrial park was finalized through agreements between the government and private parties, and arrangements for the supply of core equipment were established via a quadripartite agreement, marking the entry of this project into a phase of substantive progress across its entire value chain. On December 25, the Wuhai Municipal Government and Dongjing Green Energy held a signing ceremony for the investment cooperation agreement. The investment cooperation agreement for the \"Shanghai Dongjing Green Energy Wuhai Biodegradable Materials Industrial Park Project\" signed by both parties includes a PBAT production facility with an annual capacity of 1.2 million tons, as well as projects for modifying materials on a scale of 3 million tons per year and for producing finished products at a rate of 2 million tons per year. The goal is to develop a complete industrial chain centered around PBAT, spanning from coal to BDO, then to PBAT, and finally to biodegradable modified materials. Prior to this government-enterprise agreement, the supply of equipment for the project’s core units had already been arranged. On the evening of December 22, Zhuoran Co., Ltd. announced that its wholly-owned subsidiary Zhuoran Digital Intelligence officially signed a Four sides amendment agreement under the \"General Contract for the Construction of the 1.2 million-ton per year PBAT biodegradable polyester production project at Inner Mongolia Dongjing Zhongke New Materials Co., Ltd.\" with the project owner Dongjing Green Energy, Inner Mongolia Dongjing Zhongke New Materials Technology Co., Ltd. (a wholly-owned subsidiary of Dongjing Green Energy, hereinafter referred to as \"Dongjing Zhongke\"), and the EPC general contractor Shanxi Installation Group Co., Ltd. (hereinafter referred to as \"Shanxi Installation\"). Based on the cooperation framework of the original contract, this supplementary agreement specifies the total amount of orders for which Zhuoran Digital will be responsible under the project; it will be tasked with supplying the equipment. The estimated value of these orders is 403,283.45 million yuan, which represents 142.09% of Zhuoran Shares’ audited operating revenue for the year 2024. It is understood that the core component of this series of collaborations is the Dongjing Zhongke project, which aims to produce 1.2 million tons per year of PBAT biodegradable polyester. This project is located in Wuda District, Wuhai City, Inner Mongolia, and it involves the construction of a production line for PBAT biodegradable polyester resin with an annual capacity of 1.2 million tons, as well as THF recovery facilities. Additionally, auxiliary facilities such as a central control room and substation systems will be built as part of this project. Upon completion, the project will become the largest single PBAT biodegradable polyester production line in China. With a substantial total investment, it is in line with the **\"dual carbon\" strategy goals, aiming to drive the transformation and upgrading of the traditional chemical industry toward greener and more environmentally friendly practices. In terms of the partners involved, all parties possess strong capabilities to support the progress of the project: Dongjing Green Energy was established jointly by Inner Mongolia Dongjing Bio-Environmental Protection Technology Co., Ltd. and Beijing Zhongke Green Energy New Materials Co., Ltd. Dongjing Bio-Environmental Protection is a leading domestic manufacturer of biodegradable and modified materials, having established a complete industrial chain in key areas such as PBAT ; Dongjing Zhongke focuses on the research, development, and industrialization of high-performance green new materials. Its main business activities include the development of new material technologies as well as the manufacturing and sales of bio-based materials, with the goal of becoming a leading enterprise in the field of biodegradable materials in China ; As a core subsidiary of Shanxi Construction Investment Group Co., Ltd., a state-owned enterprise in Shanxi Province, Shanxi Installation was listed on the main board of the Hong Kong Stock Exchange in November 2023; it is able to provide integrated system solutions for projects across the entire process and throughout the production chain ; Zhuoran Digital provides support for the implementation of project’s core equipment, thanks to its capability to supply professional equipment. The signing of this government-enterprise agreement along with the equipment supply contract has established a collaborative framework characterized by the government providing support, enterprises taking the lead in implementation, and coordinated efforts across the entire chain. This not only lays a solid foundation for the rapid progress of the Dongjing Green Energy Wuhai Biodegradable Materials Industrial Park project, but it will also inject strong momentum into the green transformation of Wuhai as a resource-based city, thereby facilitating the high-quality development of the regional green new materials industry.
Reply #22025-12-27
The Shanghai Dongjing Green Energy Wuhai Biodegradable Materials Industrial Park project is a green chemicals and new materials industry project that is to be given priority in Inner Mongolia Autonomous Region’s development plans for 2025. It is located in the Wuhai High-Tech Industrial Development Zone in Wuda District, Wuhai City, with a total investment of around 10.7 billion yuan; it is financed and constructed by Shanghai Dongjing Green Energy New Materials Co., Ltd. Leveraging the abundant coal resources in the Wuhai region and its existing BDO (1,4-butanediol) industry infrastructure, this project uses coal-based resources as a starting point to establish a complete industrial chain that ranges from basic chemical raw materials to end-use biodegradable products. This project mainly involves the construction of a PBAT production facility with an annual capacity of 1.2 million tons, a modification facility with an annual capacity of 3 million tons, and a products manufacturing facility with an annual capacity of 2 million tons. Its goal is to develop a complete industrial chain centered on PBAT, ranging from coal to BDO to PBAT to biodegradable modified materials. Among them, Inner Mongolia Dongjing Zhongke New Materials Co., Ltd. (founded on March 4, 2025, with Inner Mongolia Dongjing Bio-Environmental Protection Technology Co., Ltd. and Ye Zhang Zhongke Green Energy New Materials Co., Ltd. holding 58% and 42% of the shares respectively) has a project to produce 1.2 million tons of PBAT biodegradable polyester per year, with a total investment of 551,216 million yuan. The project was approved for registration on June 7, 2025; it involves the construction of a production line for 1.2 million tons of PBAT biodegradable polyester resin per year as well as a THF recovery unit. Additionally, auxiliary facilities such as a central control room, substation, cabinet rooms, tank areas, heat medium stations, circulating water stations, and sewage treatment plants will be built as part of this project. Shanxi Installation Group Co., Ltd. is the EPC general contractor for this project.
Reply #32025-12-28
【Ten Years of Rapid Development in Chemical Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Hachuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-28
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52025-12-28
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2025, Shaanxi Gas Turbine Power joined forces with Ningxia Runxia to carry out China’s first project to convert nitric acid production units from steam-driven to electric-driven systems. https://bbs.hcbbs.com/thread-5709560-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #82025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-29
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling TeTu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #102025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Many breakthroughs achieved from 2025 to 2035! The first phase of pipeline laying for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.