Thread Content
On November 24, the jacket for Shell Nigeria’s HI project, which was under the company’s general contracting, was completed at the Tianjin Intelligent Manufacturing Base. The HI project is a landmark initiative in which CNOOC Engineering collaborated with Shell for the first time as an EPC general contractor. It is located in the OML144 block in the southern part of the Niger Delta, 50 kilometers off the coast at a water depth of 100 meters. The main components of the project include an upper structure with four decks and a four-leg jacket, and it utilizes a hybrid power supply system combining wind energy and solar energy. Once completed, the project will transport 350 million cubic feet of natural gas per day to Nigeria’s NLNG Line 7 expansion project, helping to increase the country’s liquefied natural gas production capacity by 35% and reinforcing its position as Africa’s largest producer of natural gas.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Direct discharge of condensate water from gas compressors in a certain workshop (a serious safety hazard) https://bbs.hcbbs.com/thread-5706461-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Chemical Safety Documents】Recommended article: Interpretation of the \"Criteria for Identifying Major Accident Hazards in Industrial and Trade Enterprises\" https://bbs.hcbbs.com/thread-5706517-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2848-2025: Zhanghua Machinery’s production of clean workshop facilities, TA2G titanium materials, and ammonia-containing condensate stripping towers – delivery completed. https://bbs.hcbbs.com/thread-5706081-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s First High-Pressure Underground Hydrogen Storage Well Refueling Station Built in Chongqing from 2025 to 2851 https://bbs.hcbbs.com/thread-5706583-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot-scale biomass gasification project developed by Donghua Company in China’s chemical engineering sector began operations in 2025, producing syngas. https://bbs.hcbbs.com/thread-5706633-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating electricity from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 660-megawatt ultra-supercritical circulating fluidized bed boiler was approved for use, 2856–2025 https://bbs.hcbbs.com/thread-5706795-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))